My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDANCE - 60A
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
01/21/2020
>
CORRESPONDANCE - 60A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 12:12:41 PM
Creation date
1/21/2020 8:33:05 AM
Metadata
Fields
Template:
City Clerk
Item #
60A
Date
1/21/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2500 N. Main St., <br />Santa Ana, CA 92705 <br />714.542.CUB[ (2823) <br />dlscoverycitbe.org <br />Santiago Park Safety <br />• The project includes improvements to the park that is in need of refurbishment, new <br />equipment, and a thoughtful redesign that will make the park a safe place to visit. Years <br />ago, we stopped sending field trip students to Santiago Park during lunch time because <br />we felt it was too dangerous. Our alternative is for them to eat lunch sitting on the <br />concrete floor so obviously we look forward to the time that it is safe enough that our <br />students can go back to the par], for lunch, <br />• The developer has offered to provide roving security throughout the Santiago Park <br />neighborhood and the surrounding area. This will have a direct benefit to the Cube <br />patrons and help ensure our daily visitors and staff are safe. <br />Rocket Parking Lot <br />• The existing parking lot North of the Cube is what we refer to as the Rocket Lot due to <br />the Delta 3 Rocket on the corner. We have an option of building a parking structure on <br />the Rocket Lot but it would cost significantly more and would only get us 150 additional <br />spaces leaving us still short of our code requirement. Plus, during the construction time <br />we would we be without the spots provided by this lot, putting our attendance at risk. In <br />comparison the new lot on the corner of Main and Edgewood will give us 180 spaces (30 <br />additional spaces), which is enough to meet our code requirement and not take our <br />existing lots out of service. <br />• Additionally our Rocket Lot will remain as an asset to the Cube ensuring our ability to <br />grow future exhibition space to enhance our educational mission for years to come. <br />I personally take great pride in the Discovery Cube and have dedicated my career, my voice, and my <br />passion to creating a beautiful & impactful gem for the City of Santa Ana and the children of Orange <br />County. I know that many of you truly care about the Cube and our mission as well and wanted you <br />to know why we are in full support of the residential & parking lot project at 2525 North Main Street <br />and hope that we have your full support as well. <br />Thank you. <br />0J Adams <br />CEO Discovery Cube <br />Discovery Cube is a registered 501(c)3 nonpmtlt organization. All rights reserved ®Discovery Science Foundation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.