My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-2980
Clerk
>
Ordinances
>
2011 - 2020 (NS-2813 - NS-3000)
>
2020 (NS-2979 - NS-3000)
>
NS-2980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 2:19:53 PM
Creation date
1/23/2020 2:18:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Ordinance
Doc #
NS-2980
Date
1/21/2020
Destruction Year
P
Document Relationships
2020-028 - Accepting the Certificate as to Verification of Signatures
(Related to)
Path:
\Resolutions\CITY COUNCIL\2011 -\2020
NS-2988
(Amended By)
Path:
\Ordinances\2011 - 2020 (NS-2813 - NS-3000)\2020 (NS-2979 - NS-3000)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ro as to interfere with safe and free: parking movement, car door <br />opening, or of visibility. <br />(3) Aisles to and from parking stalls shall not be less than: Twenty-three: <br />(23) feet wide for 90-degree parking. <br />(4) Drive aisles shall not dead-eM; a turn -around method be provided to <br />allow cars to exit if all stalls are occupied <br />(5) The interior of the parking structure without natural lighting shall be <br />painted white or shall be equipped with lighting devices which will <br />provide a minimum maintained two (2) footeandle of light on the <br />parking surface during hours of darkness. Subterranean parking areas <br />shall maintain lighting twenty-four (24) hours a day. Lighting devices <br />shall be protected by vandal resistant covers. <br />(6) A minimum of ten (10) bicycle spaces shall be provided onsite. 'rhe <br />design and materials shall comply with the approved materials board <br />submitted for the project during building plan check. <br />(7) Prior to submittal into building plan check, a parking management plan <br />shall be submitted to the Planning Division for review, identifying <br />parking per unit, and guest parking The plan is subject to approval of <br />the Executive Director of the Planning and Building Agency. Onsite <br />parking shall be provider) for residents and visitors of the Project and <br />the parking demand of the Project site shall be actively monitored. <br />Property owner "Owner" shall continually monitor and take appropriate <br />measures to manage the parking demand of the Project site to mitigate <br />the use of offsite parking spaces on private or public properties andfor <br />right-of-way. <br />SECTION 12- Vehicular Access in Specific Developnsent Nu. 93 <br />the dLvelopment shall prepare: all neeessary plans per City Standards and to the satisfaction of the <br />City Engineer to: <br />(a) Provide public access via Walkie Way/Park Santiago Drive and %lain Street The <br />Santiago Park Entrance design and construction shall be subject to the review and <br />approval of the City s Planning & Building, Public Works, and Parks, Recreation and <br />Community Services Agency Direr -tors, including residential units to front onto <br />Santiago Park, Main Street, and the Santiago Park Drive entrance- <br />(b) Reconstruct the existing intersection of Main Street and W'alkie W"aydPark Santiago <br />Drive to accommodate the southerly relocation the east leg of the intersection, <br />including, but not limited to: <br />i. Removal of all portions of the existing east leg of the intersection. <br />ii. Construction of PCC curb, gutter and sidewalk along the cast side of Main <br />Street <br />iii. Reconstruct pavement within the intersection. <br />4of12 <br />Ordinance No. NS-2980 <br />Page 15 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.