be provided for the removal of an existing wall and construction of a new shared property line wall <br />upon submittal for plan check. <br />41. Pre -Construction Meeting. Prior to the commencement of construction on the site, the developer <br />shall schedule a pre -construction meeting between the general superintendent or field <br />representative and the Planing Division to discuss the approved plans and construction <br />requirements. <br />ENGINEERING <br />42, The Applicant shall submit Improvement Plans prepared by a Registered Civil Engineer for public <br />works (off -site) improvements, and on -site improvements. Plan check fees shall be paid in advance. <br />43. An on -site grading and drainage plan shall be prepared and submitted to the City Engineer for <br />approval. Plan shall be 24" x 36", with elevations to nearest 0.01 foot, minimum scale 1" = 20'. <br />Plan shall be prepared by Registered Civil Engineer. Public works improvements may be shown <br />on this plan. Grading plan check fees must be paid in advance. <br />44. Hydrologic and hydraulic calculations demonstrating adequate site drainage from a l0-year return <br />- frequency storm (25-year frequency in sump areas) prepared by a Registered Civil Engineer shall <br />be submitted with the Grading Plan. <br />45. Driveway slope shall be a rainfmum slope ofore for asphaltand.5°% for concrete.- - - - - - - - - - <br />46. If utility cuts are excessive in the street the street must have a grid and overlay placed on it per the <br />satisfaction of the City Engineer. <br />47, All existing off -site public improvements (sidewalk, curb and gutter, driveways, and street paving) <br />at the development sitewhich are in a damaged condition or demolished due to the proposed work <br />shall be reconstructed to the satisfaction of the City Engineer, and per OCPFRD Standard Plan. <br />48. A City Encroachment (Public Works) permit shall be taken out for all work in public right-of-way <br />prior to start of work. All work shall be done in accordance with APWA Standards and to the <br />satisfaction of the City Engineer and must be completed prior to foal approval for occupancy or <br />the issuance of Certificate of Occupancy. <br />49. A bond or surety device shall be posted with the City in an amount and type sufficient to cover the <br />amount of off -site work to be done, as approved by the City Engineer. <br />50. Pad certification by the Design Civil Engineer and Soil Engineer is required prior to the <br />commencement of structural construction. <br />51. Final compaction report prepared by a qualified Soil Engineer shall be submitted to the City <br />Engineer for review and approval prior to the commencement of structural construction. <br />52. Prior to the issuance of any grading or building permits or prior to recordation upon subdivision of <br />land if determined applicable by the City Building Official, the applicant shall submit to the City <br />for review and approval a Final Water Quality Management Plan (WQMP) that: <br />#21124v3 <br />Ordinance NS-2979 <br />Page 54 of 59 <br />