My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1 - CUP19-03_1211 S MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
10-14-19
>
1 - CUP19-03_1211 S MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 3:28:19 PM
Creation date
1/27/2020 3:27:34 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution No. 2019-xx <br />Page 1 of 5 <br /> LS 10.14.19 <br />RESOLUTION NO. 2019-xx <br /> <br />A RESOLUTION OF THE PLANNING COMMISSION OF <br />THE CITY OF SANTA ANA APPROVING CONDITIONAL <br />USE PERMIT NO. 2019-03 AS CONDITIONED TO RENEW <br />THE ENTITLEMENTS OF AN EXISTING 60-FOOT TALL <br />MAJOR WIRELESS COMMUNICATION FACILITY <br />LOCATED AT 1211 SOUTH MAIN STREET <br /> <br /> <br />BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF <br />SANTA ANA AS FOLLOWS: <br />Section 1. The Planning Commission of the City of Santa Ana hereby finds, <br />determines and declares as follows: <br />A. Emanuel Higgins with Tectonic Engineering, representing Verizon <br />Wireless (“Applicant”), is requesting approval of Conditional Use Permit <br />(“CUP”) No. 2019-03 to renew the entitlements of an existing 60-foot tall <br />major wireless communications facility disguised as a mono-palm located <br />at 1211 South Main Street. <br />B. On August 28, 2000, the Planning Commission approved Conditional Use <br />Permit No. 1999-23 allowing the construction of the subject major wireless <br />communications facility. <br />C. Pursuant to Santa Ana Municipal Code (“SAMC”) Section 41-198.10, a <br />Conditional Use Permit is required for major wireless communications <br />facilities established in the City of Santa Ana. <br />D. In addition, SAMC Section 41-198.13 states that major wireless <br />communications facilities shall be approved for a period not to exceed ten <br />(10) years. <br />E. As the current facility has reached its 10-year term, the Applicant is <br />required to apply for a new CUP in order to maintain the entitlements for <br />the current facility. <br />F. On October 14, 2019, the Planning Commission held a duly noticed public <br />hearing on Conditional Use Permit No. 2019-03. <br />G. The Planning Commission determines that the following findings, which <br />must be established in order to grant this Conditional Use Permit pursuant <br />to SAMC Section 41-638, have been established for Conditional Use <br />Permit No. 2019-03 to renew the entitlements of an existing 60-foot tall <br />major wireless communication facility: <br />1 - 7
The URL can be used to link to this page
Your browser does not support the video tag.