Laserfiche WebLink
-Underground Wiring Damage <br />-Extra Work Requested by the Director's Representative <br />Contractor will not be considered responsible for replacement, Contractor must prove to <br />the satisfaction of Director's Representative that one of the above occurred in order to be <br />excused from performing under the Agreement, <br />Extra Work or Outside the Scope of Work -Damage (a.k.a. Extra Work) shall be <br />compensated: <br />i Labor- 25% above prevailing wage <br />ii Materials- 15% above retail contractors cost <br />ii Equip Rent- l5% above contractor's cost <br />All Extra Work or Outside the Scope of Work -Damage work shall be performed by <br />Contractor's staff other than the routine maintenance staff assigned to the contract. Any <br />stall routine maintenance Contractor's staff discovered performing Scope of Work - <br />Damage work shall not be charged as Extra Work. <br />2.0 UNIFORMS AND VEHICLES IDENTIFICATION <br />2.1 The Contractor shall provide to all field personnel a standard uniform including but not <br />limited to uniform company hats, collared work shirts, pants, jackets, cold weather vests <br />and ANSI approved safety shoes. All uniforms will be marked by patch, silk screen or <br />embroidery with the company name and logo or other form of identification. <br />2.2 All equipment shall be clearly identified on both sides and rear of the vehicles as belonging <br />to the Contractor, well maintained, in excellent working condition, be clean in appearance <br />and without extensive visible damage, dirt graffiti etc. In addition, all vehicles shall have <br />the company's name, contractor's license number and contact information clearly <br />identified on both sides and the rear of the vehicle. <br />2.3 The Director's Representative reserves the right to direct the Contractor to remove an <br />employee or piece of equipment for not meeting high maintenance and appearance <br />standards. <br />3.0 SAFETY REQUIREMENTS <br />3.1 All work performed under this contract shall be completed with maximum safety as the <br />priority above all other requirements. The Contractor shall be incompliance with his/her <br />companies City approved Illness and Injury Prevention Program and all Federal, State and <br />Local OSHA requirements, laws and regulations. <br />3.2 All work performed under this contract shall be performed in strict compliance with all <br />federal, state and local safety laws, regulations or other authoritative mandates that protect <br />workers and the general public, including but not limited to, excavation/trenching/shoring, <br />blood borne pathogens, hazardous waste identification and transport and pesticide use and <br />reporting, <br />City of Santa Ana RFP 19-092 <br />Page 32 <br />