Laserfiche WebLink
21.1 The Director's Representative may evaluate each of the Contractor's staff and if he/she <br />finds that a Contractors employee or sub -contractor's employee is not performing to the <br />satisfaction of the Director's Representative, the Director's Representative shall require the <br />Contractor to remove the employee from work sites at his or her discretion within 24 11eUPS <br />of written notice. <br />22.0 MATERIALS <br />22. l The Director's Representative shall approve or reject all materials delivered to the work <br />site. In addition, the Contractor shall not apply any materials until the Director's <br />Representative inspects the materials to confirm they are correct per specifications. Note <br />that the Director's Representative may stay at the work site to confirm that all materials <br />are applied correctly and in the quantities specified. Materials applied by the Contractor <br />prior to the Director's Representative inspecting the materials shall be considered not <br />applied. Therefore, the Contractor shall not be given credit towards the quantity of the <br />specified material required to be applied by the specification. The Contractor shall then be <br />required to deliver the specified quantity of material to the work site and, following the <br />Director's Representatives approval, apply the materials in the presence of the Director's <br />Representative: <br />Prior to the application or use of any materials the Contractor shall submit to the Director's <br />Representative a minimum 48 hours before delivery to the work site a list of all materials <br />and/or chemicals that may be used pursuant to the terms of this Agreement. The list shall <br />include the name of the product, the products specifications, and the quantity of materials, <br />prescribed method of use/application, Material Safety Data Sheets and chemical analysis <br />where applicable, recommended usage and any other manufacturer's data that may be <br />pertinent, The list must be submitted before any materials/chemicals are used pursuant to <br />this Agreement. <br />22.1.1 The materials and chemicals utilized in furtherance of this Agreement shall comply <br />with the following standards: <br />All fertilizers shall be complete, furnishing the required percentage of nitrogen, <br />phosphatic acid and potash to keep turf, trees, shrubs and other plants in a healthy <br />and vigorous growing condition. <br />Pesticides including but not limited to: Insecticides, fungicides, herbicides, <br />algaecides, aviacides, and rodenticides shall be of the best quality obtainable and <br />available on the market, property labeled with guaranteed analysis, and brought to <br />the job site in the manufacturer's original container, <br />Materials shall as specified herein, matching those existing at the work site, or as <br />specified by the Director's Representative. <br />22. L2 All materials delivered to the site shall be accompanied by a packing slip or other <br />form from the vendor indicating the specific commodity delivered and the quantity. <br />23.0 TRASH DISPOSAL. AND RECYCLING <br />23.1 All organic waste (including leaves, grass clippings, brush, branches, and tree parts) <br />resulting from work performed under this contract shall be disposed of pursuant to the <br />City of Santa Ana RFP 19-092 <br />Page 37 <br />