Laserfiche WebLink
Pmposal for <br />Our proposed team is highly qualified and motivated to undertake this project, Their credentials are <br />summarized below and full resumes are appended to this proposal. <br />Project Manager <br />Nate Schreiner, PE, Qso <br />Mr. Schreiner manages civil <br />engineering projects,; applying his <br />technical experience With roadway, <br />grading, flood protection structures, <br />hydrologic and hydraulic modeling, ADA assessments, <br />and cost estimating, for municipal clients throughout <br />Southern California. He is currently serving as the <br />project manager for the planning, pre -design, and <br />design of complete streets projects for the City of <br />Los Angeles involving pedestrian signals, pedestrian <br />push buttons, cross walks, and road striping, Mr. <br />Schreiner is reviewing the design, managing staff, and <br />CITY ter SAN TA ANA <br />managing surveying and underground utility mapping <br />subcontractorsi <br />RELEVANT EXPERIENCE: <br />Complete Streets Projects, City of Los Angeles <br />Task Order Managerfor On -Galt Contracts with Los Angeles County <br />Metropolitan Transportation Authodiy (Metro), City of Los Angeles; <br />John Wayne Airport, Riverside County Transportation Commission <br />(ROTC), Orange County Public Works (OCPW), and Los Angeles <br />County Department of Public Works <br />Caruthers Park Stormwaterand Urban Runoff Capture Project, City <br />of âś“ieliilower <br />Las Angeles Uaifled School Oistdct (LAUSO), ADA Barfier Removal <br />Program, Los Angeles County <br />25K4d21 <br />