My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 11:31:42 AM
Creation date
1/29/2020 11:23:29 AM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC
Contract #
A-2020-012
Agency
PUBLIC WORKS
Council Approval Date
1/21/2020
Expiration Date
1/20/2021
Insurance Exp Date
10/1/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
by field inspectors during Construction, All quantity <br />calculations will be checked during our QA/QC <br />Process prior to each of the 000/a, 95% a no 100% PS&E <br />submittals. <br />Construction Document Submittal Format <br />Tetra Tech will provide the 30%, 60?./o, 95%,And 1Q00X <br />PS&E submittal documents for review and approval. <br />The subimittal package will include: <br />0 Four (4) setsof full size (24!N86") plans, along <br />with electronic pdf copies. 100%plan sets will be <br />Signed and sealed, and MicroStation electronic <br />copiesWillbe provided for the 100%i;ubmittal, <br />a Electronic copies of General and Special Provisions <br />in MS Word. The documents will be provided <br />showing tracked changes far the�0%9,'O%, and <br />951/osubmittaIs, <br />0 Electronic coples6fcostiastIM;itO <br />4b Electronic copies of design check calculations <br />(Starting at 60% submittal) and reports, Draft <br />WOMP to, be provided at 60%,Submittal and Final <br />WCMP at 95% Submittal. <br />0 Tetra Tech will provide the Final PS&E documents <br />for review and approval of the City In both <br />hardcopy and electronic copy per the RFP <br />requirements, and they will be ready to advertise <br />the project forcoristruction. <br />mm�� <br />Tetra Tech will prepare a Water Quality Management <br />Plan in accordance with the requirements from <br />the orange County Technical Guidance Document <br />(TGD), dated, December -2013, prepared in response <br />to the permit requirements from the Santa Ana <br />Regional Water Quality Coritrof Board. Per the , TGD <br />requirements, the project will comply with USEPA's <br />Green Streets standards to the maximum extent <br />practicable. The WOMP will be prepared using the <br />County's Standard template, Submittals will consist <br />of a draft and final version of the WQMP document. <br />Based on preliminary sail evaluations, infiltration <br />BIMPSappear to be feasible for this project, However, <br />the City has indicated infiltration is not anticipated to <br />be feasible at the site based on past experience, and <br />the project will instead utilize proprietary bofiltration <br />BMPs. <br />Tetra Tech will be available to respond to questions or <br />Items requiring interpretation in the <br />FIRST STREET PEDESTRIAN IMPROVEMENTS PS&E <br />OR NO: w-lio <br />drawings or specifications that are discovered during <br />the bidding period. A total of eight (8) labor hours has <br />been allocated to Support the answering of questions <br />during the bid period if necessary, Our design team <br />will also provide thelbilowirig construction support <br />services, <br />0 Tetra Tfth will Attend the pre -construction <br />meeting with the successful construction <br />Contractor upon notification by the City. <br />-0 Tetra Tech will attend up to four (4) field visits, <br />While TAGCwill attend up to two (2) field visits. <br />0 Tetra Tech will answer up to five (5) reicluests for <br />Information (RFI) from the Contractor during the <br />construction period, white TAGCwill answer up to <br />three (3) UK <br />0 Tetra Tech Will revei* up to eight (8) submittals <br />'or shop drawings required to Support the <br />construction contract, while TALC Will review <br />up to four (4) submittals or shop drawings. The <br />scope includes up totwo (2) reviews for each <br />Shop drawing or submittal. Shop drawings or <br />submittals requiring, more, tha ntwo (2) reviews <br />Will be.cownted as additional shop drawingor <br />submittal review. <br />Schedule <br />T6tra Tech will meet the schedule requirements of <br />the Arp Grant. Based on the assumed Project Design <br />Award Date of January 2 na, 2020, We can cornmit,to <br />the included schedule for completion of the design <br />services in April 2020, Ekhthit 2 on page 19 shows our <br />task sequence and major milestones. A few key ele- <br />ments of the schedule to note include the following: <br />0 Durations are In working days. <br />The schedule may vary based on the actual notice to <br />proceed date and the client review times, <br />0 Five (5) working days have been provided for the <br />cityl s review of the milestone submfttals, -except for <br />the 80% P,$&E submittal, It has been assumed the <br />30% PS&E stibrnittal will be reviewed and approved <br />curing the 30% PS&E milestone meeting. <br />0 Due to the accelerated PS&E schedule, there is not <br />any float in the Schedule. <br />0 Preparation of the BOY. PS&E will commence prior to <br />the completion of the pre -design phase, <br />2ryKj-. f3g 5 TETRATECH <br />
The URL can be used to link to this page
Your browser does not support the video tag.