Laserfiche WebLink
Exhibit 10-H1 Cost Proposal Attachment <br />Consultant: Tetra Tech <br />DIRECT LARtaR.CONTINUED <br />Project No: RFP No, 19•110 Date:12/20/2019 <br />ClassificationjTitle <br />Name <br />Hours. <br />Actual Hourly Rate <br />Total <br />Land Surveyor" <br />Dan Helt <br />8 <br />$69.67 <br />$557.36 <br />MId. Roadway Engine.er* <br />TylerPSrm <br />376 <br />$42.31 <br />$15;908.56 <br />Mid. Drainage/LIDChgineer* <br />Chris Jansen <br />288: <br />$40.00. <br />$11520.00 <br />Mid. Civil Designer <br />Anthony Ramos <br />340 <br />$34.68; <br />$11,791,20 <br />Jr. Ovil Designers <br />:Manuel Leon <br />Ao <br />$30.21 <br />$4,224 40 <br />CAD Designer <br />David Lopez <br />446 <br />$M81 <br />$13;116.40 <br />Survey Office Technician <br />Mark Lawler <br />28. <br />$37 25 <br />$1,04% <br />2,Person Survey trew(PrevailingWage)** <br />2-PersonSurvey CfoW <br />112 <br />$102427 <br />$11454,24 <br />2-1)erson Survey Crew (Travel) <br />2-Person Survey Crew <br />14 <br />$77.92 <br />$1,090,88 <br />-ProjectAssistant. <br />Carol Kondo <br />49 <br />$28:09 <br />$i,376.43 <br />Total <br />$72p87i45 <br />25K-73 <br />