My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - AMEND FY 2019-20 ANNUAL ACTION PLAN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
02/04/2020
>
23A - AMEND FY 2019-20 ANNUAL ACTION PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 4:39:21 PM
Creation date
1/29/2020 4:35:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
2/4/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUBSTANTIAL AMENDMENT TO THE I Substantial Amendment # 1 <br />FISCAL YEAR 2019-2020 ANNUAL ACTION PLAN <br />SUBSTANTIAL AMENDMENT <br />The City is amending the 2019-2020 Action Plan to reprogram unspent Community <br />Development Block Grant (CDBG) funds in the amount of $2,155,148 from prior grant years' <br />funds to two new activities and utilize the remaining unused funds to an existing activity from <br />current program year to increase outcome goals. <br />New activities include: <br />• CDBG19-STREET IMPROVEMENT -BISHOP STREET <br />o Description: This project includes the rehabilitation of existing concrete streets. <br />Scope of work includes the removal and replacement of damaged concrete <br />pavement panels, damaged or missing sidewalk, curbs, gutters, and curb ramps. <br />Bishop St. from Flower St. to Main St. <br />Estimated Cost: $1,108,617 <br />• CDBG19-STREET IMPROVEMENT— RAITTSTREET <br />o Description: This project includes the rehabilitation of existing concrete streets. <br />Scope of work includes the removal of existing concrete pavement and <br />replacement with conventional asphalt paving. The project will also replace, <br />damaged or missing sidewalk, curbs, gutters, and curb ramps. <br />Raitt Street Rehabilitation from 5th to Civic Center. <br />Estimated Cost: $572,590 <br />Existing activities include: <br />• CDBG19- SIDEWALK IMP —AMERICANS WITH DISABILITIES ACT (ADA) CURB RAMP <br />IMPROVEMENTS <br />Description: Reconstruct existing curb ramps to comply with ADA; remove ADA <br />barriers and comply with ADA regulations. This is a current activity that will be <br />amended by utilizing the current activity's unused funds from current program <br />year to increase the outcome goals by approximately 149 curb ramps. <br />Estimated Cost: $473,941 <br />Updates to the Annual Action Plan Include: <br />• AP-15 Expected Resources <br />Updated 2019-2020 Action Plan, under CDBG Program Income: increase of <br />$2,155,148. <br />• AP-20 Annual Goals and Objectives <br />On Page 14 in Exhibit 2, Updated 2017-2018 Action Plan under Public <br />Facilities/Infrastructure: increase in CDBG funding by $2,155,148 and increase <br />Goal Outcome Indicator by 2 projects for a total of 5 projects. <br />• AP-35 Protects <br />12/2019 4 SUBSTANTIAL AMENDMENT TO THE <br />FISCAL YEAR 2019-2020 ANNUAL ACTION PLAN <br />23A-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.