Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 20-7536 <br />RESIDENTIAL STREET IMPROVEMENT BISHOP <br />PROJECT NO.: 20-7537 <br />RESIDENTIAL STREET IMPROVEMENT RAITT <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />14 <br />PCC Grinding <br />280 <br />LF <br />$ <br />$ <br />ao.00 <br />S 600. o0 <br />15 <br />Root Shave <br />3 <br />EA <br />$ <br />$ <br />Son. ¢o <br />100.00 <br />16 <br />Adjust Manhole Frame and Cover to <br />3 <br />EA <br />$ <br />$ <br />Finished Grade <br />�00, OO <br />.�, k00, 00 <br />17 <br />Furnish and Install New Water Valve Frame <br />4 <br />EA <br />$ <br />$ <br />and Cover to Grade <br />810, <br />18 <br />Furnish and Install Traffic Loops Type D <br />8 <br />EA <br />$ <br />$ <br />?O, 00 <br />J, 800. 00 <br />19 <br />Famish and Install Traffic Loops Type E <br />10 <br />EA <br />$ <br />$ <br />3Sci •o0 <br />3 Soo, o0 <br />20 <br />Signing and Striping <br />I <br />LS <br />$ <br />$ <br />-Sign <br />63oo.oa <br />6,300.00 <br />21 <br />Project Advertisement <br />2 <br />EA <br />$ <br />$ <br />( 000.00 <br />Jr0.op <br />22 <br />Labor Agreement Oversight <br />I <br />LS <br />$10,000 <br />$10,000 <br />TOTAL BASE BID $ r7a 8� 6. 00 <br />CJ <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves <br />the right to award the Base Bid, and any, al I, or none of the add -alternate bid items (if any). <br />The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />t This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within number (50) working days after the commencement date stated in the <br />Notice to Proceed. <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the <br />Standard Specifications, shall be $4,800 per calendar day. <br />2Ps p 41 <br />