My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARAMEXX CONSTRUCTION (3)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ARAMEXX CONSTRUCTION (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 10:51:41 AM
Creation date
2/6/2020 9:23:47 AM
Metadata
Fields
Template:
Contracts
Company Name
ARAMEXX CONSTRUCTION
Contract #
P 17-6802
Agency
Public Works
Council Approval Date
12/3/2019
Notes
PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City cif Santa Ana <br />Page 5 <br />Li440k1 Podaablon Pathway ATPL+6003(1 yT) (1'YAW2)., bidding on 061abur 22. 2019 2:00 PM (Pacific) <br />Pdnlas 1012612MO <br />Bid R*%Wto <br />EXHIBIT A <br />Type <br />Item Cade UOM taty Unit Price <br />Line Tatal Comment <br />52 <br />Landscaorg`° <br />LS 4 $40,00000 <br />$40,O00.00 <br />53 <br />Labor Agreamant Ovemlght <br />LS ! $10,000.00 <br />$10,000.O0 <br />Subtatal <br />11M,400.110 <br />Add Alternative 1314 One> NOT part of Beat Old Calculation <br />54 <br />Install Manh End 5irtgla Leaf Swing Gate and Fenokrg <br />LS 9 $101000,00 <br />$10,000,00 <br />65 <br />Inatoll SOLO End tale Leaf Swing Gate and Forcing <br />LE 1 $13100.00 <br />$13.500.00 <br />56 <br />lethal kT Ta0 Modular Dual Paaal panne (Ulna Pleating Not included) <br />LF 990 $156,00 <br />$134,840,00 <br />Subtotal <br />$1162,349.00 <br />Taos fist Asterisk Not" per P4 of $paaiNaaClona+NOT poet of these, SM Calbupetion <br />9T <br />` ra The quamRy for lhlo bid item is sham for bid oompadaon only. This W item shall not bo aWtject to <br />tho "38°,5" Omit as stated In Section M of <br />tna Standard �paC RCada a. <br />68 <br />1�galk n and tlgaUsm planting sib be ponsamad by =C: For the landecapfng ald Item, away the <br />pdoo to fwnirh the mao[iols tot She <br />insulation Of Ota 1-galiats. aid pianfksp shoo be included. The labor 1w the OCCC atatalassim wait {w 1 and $Oalbxe plots is Included in aid Rom <br />59 <br />f r The tad Item isconsadersd a specialty Item per Saolkrn 2.3.2 at Ito Standard $Pecifiaattbmt. <br />raa i 0 <br />0 <br />subloul <br />0 <br />Total <br />S1,1M74$.90 <br />Planotfids, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.