Laserfiche WebLink
City of Santa Ana <br />Page 4 <br />Civic Center Improvements (18-2679 & 18-2680), bidding on September 18, 2019 2:00 PM (Pacific) <br />Printed 12I09I2019 <br />Bid Results <br />EXHIBIT A <br />Type <br />Item Code <br />uOM <br />City <br />Unit Price <br />Line Total Comment <br />36 <br />Electrical Power Feed <br />LS <br />1 <br />$7,105.00 <br />$7,105.00 <br />36 <br />Steamped Concrete Paving <br />SF <br />660 <br />$13.80 <br />$9,108.00 <br />37 <br />Low Rail Wood Fence <br />LF <br />305 <br />$73.00 <br />$22,265.00 <br />38 <br />Steel Edging <br />LF <br />435 <br />$25.00 <br />$10,875.00 <br />39 <br />Bird Mesh <br />LS <br />1 <br />$39,830.00 <br />$39,830.00 <br />40 <br />Tectum Panels <br />EA <br />700 <br />$130.71 <br />$91,497.00 <br />41 <br />Remove and Replace Non -Structural Lumber <br />LS <br />1 <br />$85,143.00 <br />$85,143.00 <br />42 <br />Remove and Replace Structural Lumber <br />EA <br />25 <br />$4,170.00 <br />$104,250.00 <br />43 <br />Furring and Trim <br />EA <br />30 <br />$1,162.00 <br />$34,860.00 <br />44 <br />Power Wash Flagstone Paving <br />LS <br />1 <br />$3,089.00 <br />$3,089.00 <br />45 <br />Replace Missing Flagstone Paving <br />LS <br />1 <br />$2,110.00 <br />$2,110.00 <br />46 <br />Clean, Prepare and Paint Existing Structure <br />LS <br />1 <br />$39,472.00 <br />$39,472.00 <br />47 <br />Install New Infrastructure for Lighting <br />LS <br />1 <br />$7,449.00 <br />$7,449.00 <br />48 <br />New Light Fixtures <br />EA <br />10 <br />$1,453.00 <br />$14,530.00 <br />49 <br />Soil Preparation and Fine Grading <br />SF <br />2775 <br />$1.00 <br />$2,775.00 <br />50 <br />Irrigation <br />SF <br />3400 <br />$5.53 <br />$18,802.00 <br />PlanetBids, Inc. <br />