CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number 17-6880 Santa Ana Boulevard and 5th Street Protected Bike Lane Change Order Number 4 <br />To Vido Samarzich Inc. Contractor <br />You are hereby directed to make the herein changes from the plans and speclficatlons or do the following described work iot Included In the plans and <br />specifications on this contract <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCILOR CITY MANAGER, <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance wil be made for idle time, <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED PRICE UNIT PRICE <br />1. Add additional irrigation line to service island. (PCO #11) <br />Total Cost = $6,019,62 <br />2, Add color additive to the concrete for the driveway approach poured at the Federal Building. <br />(PCO #12) <br />Total Cost = $606.24 <br />3. Temporarily backfill all open excavation/ramps with base and AC at the intersection of Ross, 5th <br />Street, and Santa Ana Blvd. (PCO #13) <br />Total Cost = $20,368.26 <br />4. Rental of 2 arrow boards used on the intersection of 51h St and Ross on the south side of Santa <br />Ana Blvd due to City request to postpone pouring concrete work. (PCO #14) <br />Total Cost = $4.984,65 <br />5. Clean and paint 2 coats of red curbs on 51h Street and 6th Street from Santa Ala Blvd to <br />Santiago. No existing bid Item. (PCO #15) <br />Total Cost = $6,462.35 <br />6. Grind and overlay all lanes with Asphalt Rubber Hot Mix on 5th Street, 61h Street, and Santiago <br />Street including utility adjustments. (PCO #16, #17) <br />Total Cost = $286,999.00 <br />TOTAL CHANGE ORDER AMOUNT = $324 430 02 <br />Page 1 of 2 <br />