My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VIDO SAMARZICH, INC. (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
VIDO SAMARZICH, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2022 12:01:25 PM
Creation date
2/6/2020 9:25:56 AM
Metadata
Fields
Template:
Contracts
Company Name
VIDO SAMARZICH, INC.
Contract #
P 17-6880
Agency
Public Works
Council Approval Date
12/17/2019
Notes
PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Page 4 <br />Santa Ana Boulevard and Sth Street Protected Bike Lane ATPL - 5063 (17-6880), bidding <br />or November 6, 2019 <br />2:00 PM <br />Printed 11/06/2019 <br />Bid Results <br />EXHIBIT A <br />Type <br />Item Code UOM <br />City <br />Unit Price <br />Line Total <br />Comment <br />36 <br />Traffic Signal and Signal Interconnect (5th St and Broadway) <br />LS <br />1 <br />$100,000.00 <br />$100,000.00 <br />37 <br />Traffic Signal and Signal Interconnect (5th St and Bush St) <br />LS <br />1 <br />$95,000.00 <br />$95,000.00 <br />38 <br />Video Detection System at 5th St and Broadway <br />LS <br />1 <br />$40,000.00 <br />$40,000.00 <br />39 <br />Video Detection System at 5th St and Main St <br />LS <br />1 <br />$40,000.00 <br />$40,000.00 <br />40 <br />Video Detection System at 5th St and Bush St <br />LS <br />1 <br />$40,000.00 <br />$40,000.00 <br />41 <br />Install 2" PVC Conduits <br />LF <br />150 <br />$60.00 <br />$9,600.00 <br />42 <br />Install 3" PVC Conduits <br />LF <br />60 <br />$70.00 <br />$4,200.00 <br />43 <br />Install 4" PVC Conduits <br />LF <br />350 <br />$95.00 <br />$33,250.00 <br />44 <br />12 — SMFO Cable <br />LF <br />1225 <br />$3.00 <br />$3,675.00 <br />45 <br />Fusion Spice 1 Strand SMFO <br />EA <br />2 <br />$400.00 <br />$800.00 <br />46 <br />IP Communication System at 5th St and Broadway <br />LS <br />1 <br />$16,000.00 <br />$16,000.00 <br />47 <br />CCTV and IP Communication System at 5th St and Main St <br />LS <br />1 <br />$18,000.00 <br />$18,000.00 <br />48 <br />Landscape — <br />LS <br />1 <br />$130,000.00 <br />$130,000.00 <br />49 <br />Planting of Shrubs and Succulents by OCCC <br />LS <br />1 <br />$2,816.00 <br />$2,816.00 <br />50 <br />Irrigation <br />LS <br />1 <br />$450,000.00 <br />$450,000.00 <br />51 <br />120 Day Plant Maintenance and Establishment Period <br />LS <br />1 <br />$6,000.00 <br />$6,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.