Laserfiche WebLink
MITIGATION MONITORING AND REPORTING PROGRAM <br />MAGNOLIA AT THE PARK MULTI-FAMILY RESIDENTIAL PROJECT FINAL EIR <br />Required Measure Implementation Timing <br />Responsible for <br />Ensuring Compliance / <br />Verification <br />Date <br />Completed <br />and Initials <br />Project Description Features <br />PDF-1: The landscape plan will incorporate the existing mature trees located along the eastern and <br />southern project site boundaries, which were identified as healthy by the Arborist Report (MMRP <br />Attachment A). <br />In Construction and Landscape <br />Plans and Specifications. Prior to <br />Demolition and Construction <br />Permits <br />City of Santa Ana Building and <br />Safety Division <br /> <br />PDF-2: The project will include at least 15 electric vehicle charging stations. In Site Plans and Specifications. <br />Prior to Occupancy Permits <br />City of Santa Ana Building and <br />Safety Division <br /> <br />PDF-3: The project will include installation and maintenance of air filtration systems with efficiencies <br />equal to or exceeding a Minimum Efficiency Reporting Value (MERV) 16 as defined by the American <br />Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE) Standard 52.2 within all <br />buildings. <br />In Building Mechanical Plans and <br />Specifications. Prior to Occupancy <br />Permits <br />City of Santa Ana Building and <br />Safety Division <br /> <br />PDF-4: Outdoor trash receptacles will be provided throughout the common areas of the site, including <br />the dog park area, for the tenants to dispose of their refuse in a proper manner. Property maintenance <br />will provide trash and waste material removal, including dog feces disposal bags, to maintain a trash- <br />free property. All wastes shall be collected and properly disposed of off-site. <br />In Site Plans and Specifications. <br />Prior to Occupancy Permits <br />City of Santa Ana Building and <br />Safety Division <br /> <br />PDF-5: The project will include safety design features for security, such as low-intensity security <br />lighting, key pads for building access, security cameras, and 24-hour security personnel. <br />In Site Plans and Specifications. <br />Prior to Occupancy Permits <br />City of Santa Ana Building and <br />Safety Division <br /> <br />Aesthetics <br />Mitigation Measure AES-1: Construction plans and specifications shall state that the following <br />measures shall be implemented by the construction contractor to protect the trees along the eastern <br />and southern project site boundary that are planned for preservation during construction of the <br />proposed project pursuant to the 2018 Arborist Report (MMRP Attachment A): <br /> If the wall along the eastern boundary of the project site cannot be heightened in-place and <br />must be replaced, it shall be reconstructed with a precast concrete fence or a wall without a <br />continuous footing. <br /> Before finalizing construction plans, a contractor with an AirSpade or AirKnife shall explore the <br />locations adjacent to the preserved trees to locate large lateral roots. The root locations shall be <br />marked, and a survey provided to update the construction plans to avoid cutting any significant <br />large roots. The cutting of small roots shall be planned for late spring or winter and made with <br />In Construction and Landscape <br />Plans and Specifications. Prior to <br />Demolition and Construction <br />Permits <br />City of Santa Ana Building and <br />Safety Division <br /> <br />2-108