Required Measure Implementation Timing <br />Responsible for <br />Ensuring Compliance / <br />Verification <br />Date <br />Completed <br />and Initials <br />Project are watered at least three (3) times daily during dry weather. Watering, with complete <br />coverage of disturbed areas, shall occur at least three times a day, preferably in the mid - <br />morning, afternoon, and after work is done for the day. <br /> The contractor shall ensure that traffic speeds on unpaved roads and Project site areas are <br />reduced to 15 miles per hour or less. <br />South Coast Air Quality Management District Rule 1113: The following measures shall be <br />incorporated into construction plans and specifications as implementation of Rule 1113. The project <br />shall not include application of any architectural coating within the SCAQMD with VOC content in <br />excess of the values specified in a table incorporated in the Rule. A list of low/no-VOC paints is <br />provided at the following SCAQMD website: www.aqmd.gov/prdas/brochures/paintguide.html. All paints <br />will be applied using either high volume low-pressure spray equipment or by hand application. <br />In Construction Plans and <br />Specifications. Prior to Demolition <br />and Construction Permits <br />City of Santa Ana Building and <br />Safety Division <br /> <br />South Coast Air Quality Management District Rule 1186: The following measures shall be <br />incorporated into construction plans and specifications as implementation of Rule 1186. Sweep onsite <br />streets (and off-site streets if silt is carried to adjacent public thoroughfares) to reduce the amount of <br />particulate matter. Visible roadway accumulations shall begin removal within 72 hours of any notification <br />of the accumulation and shall be completely removed. All sweepers shall be compliant with SCAQMD <br />Rule 1186.1, Less Polluting Sweepers. <br />In Construction Plans and <br />Specifications. Prior to Demolition <br />and Construction Permits <br />City of Santa Ana Building and <br />Safety Division <br /> <br />Biological Resources <br />Mitigation Measure BIO-1: Construction plans and specifications shall state that vegetation clearing <br />during nesting season (February 1 through September 15) shall be avoided, if feasible. If avoidance of <br />the nesting season is not feasible, then a qualified biologist shall be required to conduct a nesting bird <br />survey within 3 days prior any disturbance of the site, including disking, demolition activities, and <br />grading. If active nests are identified, the biologist shall establish suitable buffers around nests at an <br />appropriate distance that is a minimum of 250 feet for raptors and 100 feet for non -raptors. The buffer <br />areas shall be avoided until the nests are no longer occupied, and the juvenile birds can survive <br />independently from the nests. <br />In Construction Plans and <br />Specifications. Prior to demolition, <br />grading, or construction permits <br />City of Santa Ana Planning <br />Division <br /> <br />Hazards and Hazardous Materials <br />Mitigation Measure HAZ-1: Prior to issuance of a grading permit, a Soil Management Plan (SMP) shall <br />be prepared by a qualified hazardous materials consultant and shall detail procedures and protocols for <br />excavation and disposal of onsite hazardous materials, including: <br /> A certified hazardous waste hauler shall remove all potentially hazardous soils. Excavation of <br />contaminated soils shall be to the depth of approximately 0.5 feet below the existing ground <br />surface in areas identified as having arsenic impacted soils. In addition, sampling of soil shall be <br />In Construction Plans and <br />Specifications. Prior to Grading <br />Permits <br />City of Santa Ana Building and <br />Safety Division <br /> <br />2-111