My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
10-28-19
>
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 2:52:36 PM
Creation date
2/13/2020 2:48:40 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
726
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table N-3: Project Operational Noise Level Compliance <br />Receiver <br />Location <br />Land <br />Use <br />Noise Level at Receiver Locations (dBA) Threshold <br />Exceeded? L50 <br />(30 mins) <br />L25 <br />(15 mins) <br />L8 <br />(5 mins) <br />L2 <br />(1 min) <br />Lmax <br />(<1 min) <br />Daytime Residential Standards <br />55 60 65 70 75 - <br />Nighttime 50 55 60 65 70 - <br />R1 Residential 37.9 40.7 44.8 48.7 51.8 No <br />R2 Residential 43.2 45.4 49.0 52.8 58.6 No <br />R3 Residential 46.3 48.6 51.7 54.9 59.9 No <br />R4 Residential 46.9 49.1 52.1 55.3 59.9 No <br />R5 Residential 36.7 39.4 45.7 51.2 58.5 No <br />R6 Residential 34.3 37.2 43.3 48.8 56.0 No <br />R7 Residential 31.4 34.2 39.0 43.6 50.3 No <br />Source: Urban Crossroads, 2019. Attachment A. <br /> <br />Conclusion for Noise <br />Consistent with the Original Project, the construction generated by the Modified Project would generate temporary <br />noise and vibration that would require mitigation to reduce impacts to a less than significant level. Also, due to the <br />location of the proposed residential units, mitigation is required to ensure that interior noise is within City standards. <br />With implementation mitigation identified in the EIR, potential impacts would be reduced to less than significant levels. <br />Based on the foregoing, none of the conditions identified in CEQA Guidelines Section 15088.5 that would trigger the <br />need to prepare a recirculated EIR or other environmental document exist. The Modified Project would not result in <br />either a new significant environmental impact or a substantial increase in the severity of a previously identified impact. <br /> EIR Mitigation Measures <br />Mitigation Measure NOI-1: The Project plans and specifications shall include the following construction requirements <br />to be implemented and verified prior to provision of occupancy permits: <br />• Windows/Glass Doors: Residential units adjacent to N. Main Street (all floors) require upgraded windows and <br />sliding glass doors (all windows/doors on all floors) with minimum STC ratings of 30; and all other buildings <br />require standards windows and sliding glass doors with a minimum STC rating of 27. <br />• Exterior Doors (Non-Glass): Exterior doors facing N. Main Street (all floors) require upgraded exterior doors <br />with minimum STC ratings of 30 and shall be well weather-stripped; and all other residential building exterior <br />doors shall be well weather-stripped and have minimum STC ratings of 27. Well-sealed perimeter gaps <br />around the doors are essential to achieve the optimal STC rating. <br />• Walls: At any penetrations of exterior walls by pipes, ducts, or conduits, the space between the wall and <br />pipes, ducts, or conduits shall be caulked or filled with mortar to form an airtight seal. <br />• Ventilation: Residential exterior vents shall be oriented away from I-5 and N. Main Street. If such an <br />orientation cannot be avoided, then an acoustical baffle shall be placed in the attic space behind the vents. <br /> <br />Mitigation Measure NOI-2: The Project plans and specifications shall include the following. requirements: <br />• Large loaded trucks and mobile equipment, such as bulldozers (greater than or equal to 80,000 pounds) shall <br />not be used within 50 feet of the eastern boundary of the Project site. Instead, smaller, rubber-tired mobile <br />equipment (less than 80,000 pounds) or equivalent alternative equipment shall be used within this area <br />during Project construction. <br />• All construction equipment, fixed or mobile, shall be equipped with properly operating and maintained <br />mufflers, consistent with manufacturers’ standards. The construction contractor shall place all stationary <br />2-162
The URL can be used to link to this page
Your browser does not support the video tag.