Parking <br />As described in Section 2, Modifications to the Original Project, the Modified Project includes a central parking <br />structure that would provide 407 spaces for the onsite residential uses and a surface parking lot that would contain <br />284 parking spaces, of which 104 would be dedicated to the onsite residential uses and 180 would be shared with <br />the OC Discovery Cube that is located across N. Main Street from the Project site and currently utilizes the site for <br />180 parking spaces. The shared parking spaces would be used by the OC Discovery Cube from 10:00 a.m. to 5:00 <br />p.m. daily and would be available for the onsite residences between 5:00 p.m. to 10:00 p.m. daily. A rolling gate <br />would separate the onsite residential and OC Discovery Cube parking areas and be opened and closed for <br />management of onsite parking. Overall, the Modified Project would provide 511 spaces for onsite residential and 180 <br />shared spaces. <br /> <br />In comparison, the Original Project included 904 parking spaces within a central parking structure to accommodate <br />the demand of the multi-family residences. The Original Project did not include a surface parking lot and did not <br />include shared parking for the OC Discovery Cube. It was planned for the existing OC Discovery Cube onsite parking <br />to relocate. <br /> <br />Table T-13 provides the estimated parking demand per the Institute of Transportation Engineers' (ITE) Trip <br />Generation (10th Edition) Land Use 221 - "Multi-family Housing (Mid-Rise)" that provides both average parking needs <br />and 85th percentile parking needs (which provides the highest parking demand 85 percent of the time). As shown, <br />the highest demand from the proposed multi-family residences would be 412 spaces on a weekday. As the Modified <br />Project is proposed to include 511 parking spaces that would be dedicated to the multi-family residences, the <br />Modified Project’s parking would accommodate needs of the development pursuant to the ITE rates, which indicates <br />that impacts related to parking would be less than significant. <br />Table T-13: Parking Demand Per the ITE Rates <br />Land Use Units <br />ITE Vehicle Parking Generation Rates Project Parking Demand <br />Average Rate 85th Percentile Average Rate 85th Percentile <br />Weekday Saturday Sunday Weekday Saturday Weekday Saturday Sunday Weekday Saturday <br />221 256 1.2 1.03 1.05 1.61 1.14 307 264 269 412 292 <br />Total Residential Parking Provided 511 511 511 511 511 <br />Total Residential Parking Required Per ITE Rates 307 264 269 412 292 <br />Parking Surplus 204 247 242 99 219 <br />Source: ITE Trip Generation (10th Edition) Land Use 221 - "Multi-family Housing (Mid-Rise) <br /> <br />To identify actual existing parking demands and provide a comparison to the ITE parking rates, parking demand <br />surveys were completed at two multi-family residential developments in the City that are similar to the Modified <br />Project in terms of rent pricing, market segment, and amenities (included as Attachment C). The surveys were <br />completed at the Nineteen01 multi-family development located at 1901 East First Street (254 units) that includes 48.4 <br />percent 1 bedroom units, 49.2 percent 2 bedroom units, and 2.4 percent 3 bedroom units; and the Marke multi-family <br />development located at 100 E MacArthur Boulevard (300 units) that includes 51.7 percent 1 bedroom units, 43.6 <br />percent 2 bedroom units and 4.7 percent 3 bedroom units. Thus, the surveyed projects have units that are larger <br />(don’t include studios) and have a greater need for parking than the 68 studios proposed for the Modified Project. <br />The parking surveys were conducted on a weekday (Thursday) and a weekend day (Saturday) for a period of 24 <br />hours. This Parking Analysis is included as Attachment C and Table T-14 provides summary of the parking survey <br />data. <br /> <br /> <br /> <br />2-181