Laserfiche WebLink
Table U-1: Comparison of Water Demands <br />Water Use Water Demand Residents or <br />Acreage <br />Daily Demand <br />(gpd) <br />Annual <br />Demand (AFY) <br />Original Project <br />Residents 120 gpd/capita 955 114,600 128.37 <br />Landscaping 3,000 gpd/acre 0.94 2,820 3.16 <br />Original Project Total 117,420 131.53 <br />Modified Project <br />Residents 120 gpd/capita 502 60,240 67.48 <br />Landscaping 3,000 gpd/acre 0.48 1,440 1.61 <br />Modified Project Total 61,680 69.09 <br />Reduction in Water Demand -55,740 -62.44 <br />GPD gallons per day; AFY = Acre Feet Yearly. <br />The increase in demand for water supplies from the Modified Project would be 2.3 percent of the UWMP’s anticipated <br />annual increase of 3,028 AFY (DEIR page 4.13-8), which is less than the 4.3 percent increase that would result from <br />the Original Project. Therefore, the Modified Project would require less water from existing entitlements than the <br />Original Project, and no new or greater impacts related to water would occur from implementation of the Modified <br />Project. <br /> <br />Wastewater <br />As shown in Table UT-1, the reduction of 240 residential units that would occupy an estimated 453 residents would <br />result in a 55,740 gpd reduction of water demand. The reduction of water demand would generate a reduction in <br />wastewater generation. As the existing wastewater infrastructure would be able to adequately accommodate the <br />Original Project, it would also be able to accommodate the reduced flows from the Modified Project. Therefore, no <br />new or greater impacts related to wastewater would occur from implementation of the Modified Project. <br /> <br />Drainage <br />Consistent with the Original Project, implementation of the Modified Project would include compliance with all <br />required laws, permits, and plans, through implementation of a SWPPP and WQMP that would be approved by the <br />City prior to receipt of construction and operational permits. The DAMP would require runoff volume to be filtered <br />through the detention and drywell systems prior to discharge off-site to manage stormwater drainage and protect <br />water quality. Thus, the Modified Project would not generate additional runoff volumes, and DAMP required treatment <br />systems would remove pollutants from onsite runoff. Therefore, consistent with the Original Project, the Modified <br />Project would result in less than significant impacts related to drainage facilities and water quality. No new or greater <br />impacts related to drainage and water quality would occur from implementation of the Modified Project. <br /> <br />Conclusion for Utilities and Service Systems <br />The Modified Project would develop 240 fewer residential units (48.4 percent less) than the Original Project, which <br />would result in 453 fewer residents at full occupancy. The reduction in residents would equate to a reduced demand <br />for water supplies and wastewater infrastructure capacity. In addition, the Modified Project would also filter runoff <br />pursuant to permitting requirements. Thus, no new or greater impacts related to utilities or services systems would <br />occur from implementation of the Modified Project. Based on the foregoing, none of the conditions identified in CEQA <br />Guidelines Section 15088.5 that would trigger the need to prepare a recirculated EIR or other environmental <br />document exist. The Modified Project would not result in either a new significant environmental impact or a <br />substantial increase in the severity of a previously identified impact. <br /> <br /> <br /> <br />2-185