My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
10-28-19
>
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 2:52:36 PM
Creation date
2/13/2020 2:48:40 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
726
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memorandum: The Addington <br />Supplemental Traffic Impact Analysis <br /> <br />D:\PROJECTS\RE - 2525 MAIN STREET\ANALYSIS OFFSET SEPTEMBER 2019 REVISED\MEMO SUPPLEMENTAL ANALYSIS.DOCX October 6, 2019 <br /> <br /> the transportation solutions company...FREEWAY SEGMENT LOS ANALYSIS <br />Freeway segment level of service analyses were conducted for existing and year 2040 with Option E conditions. The existing <br />and year 2040 with project Option E levels of service are shown in Tables I, and J. As shown in Tables I and J, the freeway <br />segments are projected to operate at the same or better levels of service as Option B (Santiago Park-Walkie Way Project <br />Access) from the July 2018 TIA. Therefore, the freeway levels of service under Option E are forecast to be the same or better <br />than the findings disclosed in the July 2018 under Option B (Santiago Park-Walkie Way Project Access). <br />QUEUEING ANALYSIS <br />A queueing analysis was included for the northbound through lanes of Main Street south of Memory Lane to Santa Clara <br />Avenue and for the turn lanes at Main Street and Walkie Way-Driveway and Main Street and Edgewood Road. With the <br />change to intersection geometrics, the storage length for the northbound left turn and the northbound through lanes at the <br />intersection of Main Street/Walkie Way-Driveway, and the southbound through lane at Main Street/Edgewood Road will be <br />reduced by approximately 90 feet. Table K lists the queueing analysis for existing, opening year cumulative, and year 2040 <br />without project conditions. As shown in Table K, all queues fit within the available storage length with the exception of the <br />southbound left-turn lane at Main Street/Edgewood Road under year 2040 conditions. Table L lists the queueing analysis for <br />Option E Main Street and Walkie Way-Driveway project access conditions. As shown in Table L, all queues fit within the <br />available storage length with the exception of the southbound left-turn lane at Main Street/Edgewood Road under year 2040, <br />under the with and without project conditions. It should be noted, that the southbound left-turn queue at Main Street/Edgewood <br />Road also exceeded the available storage length under year existing, opening year, and year 2040 with project Option A: <br />Main Street Access scenario in the TIA submitted in July 2018. Occasionally, additional queueing may occur as a result of <br />the added vehicle travel delay that is expected on Main Street at Walkie Way due to the additional phase necessary to <br />accommodate the intersection offset. However, although Option E does not result in substantial changes to queueing <br />operations surrounding the project site, the project applicant will work with the City to modify the existing raised curb median <br />on Main Street between Walkie Way and Edgewood Road. <br />CONCLUSION <br />The project has been modified to include 278 units instead of 496 units and the project access has been changed to include <br />the east leg of the intersection of Main Street/Walkie Way-Santiago Park-Driveway to create an offset intersection. Under <br />Option E Main Street/Walkie Way-Driveway project access, the study area intersections, roadway segments, and freeway <br />segments are projected to operate at the same or better levels of service as the findings disclosed in the July 2018 TIA. The <br />revised project does not create a significant impact at any intersection based on the thresholds adopted by the City of Santa <br />Ana and other agencies. The revised project also does not result in substantial changes to queueing operations at any <br />intersection. <br />We hope you will find this information helpful. Should you have any questions, please don’t hesitate to call me at (949) 656- <br />3131. <br />Sincerely, <br />translutions, Inc. <br /> <br /> <br />Sandipan Bhattacharjee, P.E., T.E., AICP, ENV SP <br />Principal <br /> <br /> <br />2-225
The URL can be used to link to this page
Your browser does not support the video tag.