My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
10-28-19
>
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 2:52:36 PM
Creation date
2/13/2020 2:48:40 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
726
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(11%)17%16%3%1 Broadway/I-5 SB Off Ramp 2 Broadway/Santa Clara Ave 3 Broadway/Buffalo Ave 4 Main St/La Veta Ave(40%)7%6%(60%)5 Main St/Town and Country Rd 6 Main St/E Memory Ln7 Main St/Walkie-Santiago Pk-Dwy 8 Main St/Discovery Cube Dwy3%1%5%9 Main St/Edgewood-I-5 Ramps 10 Main St/Santa Clara -I-5 NB 11 Main St/Buffalo Ave-I-5 SB On 12 Main St/17th St4%2%3%(4%)(8%)(5%)(8%)(2%)(3%)13 Proj. Dwy 2-Bush St/Edgewood 14 SR-22 WB Ramps/La Veta Ave 15 SR-22 EB/Town & Country Rd 16 Memory Lane/Lawson WayFIGURE 2XX%(YY%)Inbound%(Outbound%) Distribution The Addington Project Trip Distribution with Option E - Main Street and Walkie Way-Santiago Park-Driveway Access and Discovery Cube Parking40%13%5%(5%)(5%)(13%)(3%)(20%)(5%)5%13%3%(12%)7%(11%)(8%)(32%) 10%60%60%(7%)1%10%(3%)16%3%(22%)(10%)34%(60%)27%Not Analyzed in this Alternativethe transportation solutions company...26%(33%)14%(11%)(16%)40%20%(60%)D:\Projects\RE - 2525 Main Street\Analysis Offset September 2019 Revised\Z40 Dist (9/12/2019)2-227
The URL can be used to link to this page
Your browser does not support the video tag.