Laserfiche WebLink
the transportation solutions company...DirectLOSProjectIntersection Jurisdiction Standard Control ICU LOS Delay LOS ICU LOS Delay LOS ICU LOS Delay LOS ICU LOS Delay LOSAM Peak Hour PM Peak Hour Impact1 . Broadway/I-5 SB Off RampCaltrans D Yield -0.0A-0.0A-0.0A-0.0A--NO2 . Broadway/Santa Clara AvenueSanta Ana E Signal 0.988 E0.838 D0.993 E0.851 D0.005 0.013 NO3 . Broadway/Buffalo AvenueSanta Ana D Signal 0.521A0.539A0.523A0.542A0.002 0.003 NO4 . Main Street/La Veta Avenue Orange D Signal 0.653 B 0.686 B 0.655 B 0.687 B 0.002 0.001 NO5 . Main Street/Town and Country Road Santa Ana E Signal 0.671 B 0.775 C 0.677 B 0.780 C 0.006 0.005 NO6 . Main Street/E Memory Lane Santa Ana E Signal 0.573A0.564A0.574A0.567A0.001 0.003 NO7 . Main Street/Walkie Way-Santiago Park-Driveway Santa Ana D Signal - 22.4 C - 23.6 C - 20.6 C - 21.4 C - - NO8 . Main Street/Discovery Cube Driveway Santa Ana D TWSC - 17.8 C - 21.1 C - 18.0 C - 22.1 C - - NO9 . Main Street/Edgewood Road-/I-5 Ramps Caltrans D Signal - 32.9 C - 29.8 C - 32.6 C - 27.6 C - - NO10 . Main Street/Santa Clara Avenue-I-5 NB On RampCaltrans D Signal - 64.0 E * - >100 F * - 62.6 E * - >100 F * - - NO11 . Main Street/Buffalo Avenue-I-5 SB On Ramp Caltrans D Signal - 17.6 B - 30.0 C - 17.5 B - 40.6 D - - NO12 . Main Street/17th Street Santa Ana D Signal 0.956 E * 0.811 D 0.958 E * 0.812 D 0.002 0.001 NO13 . Project Driveway 2-Bush Street/Edgewood Road Santa Ana DAWSC 0.206A8.5A0.218A8.5A0.206A8.5A0.219A8.5A0.000 0.001 NO14 . SR-22 WB Ramps/La Veta Avenue Caltrans D Signal - 30.6 C - 26.6 C - 31.2 C - 26.7 C - - NO15 . SR-22 EB Ramps/Town & Country Road Caltrans D Signal - 84.5 F * - >100 F * - 92.8 F * - >100 F * - - NO16 . Memory Lane/Lawson Way Santa Ana D Signal 0.354A0.262A0.356A0.264A0.002 0.002 NONotes:* Exceeds LOS StandardAWSC = All-Way Stop Control; TWSC = Two-Way Stop Control; For TWSC intersections, reported delay is for worst-case approach/movement.LOS = Level of ServiceThe corridor on Main Street has been optimized with the modifications to the offset intersection of Main Street/Walkie Way-Santiago Park-Driveway. This results in the delay under with project condition to decrease. Table E: Year 2040 With Project Option E - Main Street/Walkie Way-Santiago Park-Driveway Access and Discovery Cube Parking Levels of ServiceChange in V/CAM Peak Hour PM Peak Hour AM Peak Hour PM Peak HourWithout ProjectWith Project----------------------------D:\Projects\RE - 2525 Main Street\Analysis Offset September 2019 Revised\LOS\2040 P Santiago2-233