My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
10-28-19
>
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 2:52:36 PM
Creation date
2/13/2020 2:48:40 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
726
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the transportation solutions company...LOSDaily DailyRoadway SegmentJurisdiction Standard Functional Classification LOS E CapacityVolume V/C Ratio LOS Volume V/C Ratio LOS1. Broadway to Main StreetCity of Santa Ana E 4-Lane Undivided 25,00010,3820.415 A10,6620.426 A0.011 NO2. Broadway to Main Street City of Santa Ana D 2-Lane One-Way 12,500 4,7700.382 A4,7780.382 A0.001 NO3. Town and Country Road to La Veta Street City of Orange D 6-Lane Divided 56,300 41,5300.738 C41,9000.744 C0.007 NO4. Memory Lane to Town and Country Road City of Santa Ana E 6-Lane Divided 56,300 34,9350.621 B35,4340.629 B0.009 NO5. I-5 Northbound Ramps to Memory Lane City of Santa Ana D 6-Lane Divided 56,300 35,2100.625 B36,1180.642 B0.016 NO6. I-5 Northbound Ramps to I-5 Southbound On-RampCity of Santa Ana D 6-Lane Divided56,30033,0330.587 A33,7890.600 A0.013NO7. South of I-5 Southbound On-Ramp to 17th StreetCity of Santa Ana E 4-Lane Divided37,50035,3630.943 E35,5610.948 E0.005NO8. Main Street to SR-22 Westbound RampsCity of Orange D 6-Lane Divided56,30027,5330.489 A27,7530.493 A0.004NO9. Main Street to Lawson WayCity of Orange D 4-Lane Divided37,50024,4590.652 B24,5880.656 B0.003NO10. Main Street to Lawson WayCity of Santa Ana E 6-Lane Divided56,30012,3840.220 A12,4910.222 A0.002NONotes:LOS = Level of ServiceV/C = Volume to Capacity RatioTable H: Year 2040 With Project Option E - Main Street and Walkie Way-Santiago Park-Driveway Access and Discovery Cube Parking Roadway Segment Levels of ServiceWithout ProjectWith ProjectIncrease in V/CDirect Project Impact?Memory LaneSanta Clara AvenueBuffalo AvenueMain StreetLa Veta AvenueTown and Country Road D:\Projects\RE - 2525 Main Street\Analysis Offset September 2019 Revised\xRoadway LOS\2040 Santiago LOS2-236
The URL can be used to link to this page
Your browser does not support the video tag.