My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
10-28-19
>
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 2:52:36 PM
Creation date
2/13/2020 2:48:40 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
726
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the transportation solutions company... <br />OY WP Project OY OY WP Project OY <br />Volumes Adjust. Trips With Project Volumes Adjust. Trips With Project <br />1 . Broadway/I-5 SB Off Ramp <br />NBL 0 0 0 0 0 0 <br />NBT 442 0 442 789 0 789 <br />NBR 0 0 0 0 0 0 <br />SBL 0 0 0 0 0 0 <br />SBT 614 0 614 578 0 578 <br />SBR 0 0 0 0 0 0 <br />EBL 0 0 0 0 0 0 <br />EBT 0 0 0 0 0 0 <br />EBR 914 4 918 890 12 902 <br />WBL 0 0 0 0 0 0 <br />WBT 0 0 0 0 0 0 <br />WBR 0 0 0 0 0 0 <br />North Leg <br />Approach 614 0 0 614 578 0 0 578 <br />Departure 442 0 0 442 789 0 0 789 <br />Total 1,056 0 0 1,056 1,367 0 0 1,367 <br />South Leg <br />Approach 442 0 0 442 789 0 0 789 <br />Departure 1,529 0 4 1,533 1,468 0 12 1,480 <br />Total 1,971 0 4 1,975 2,257 0 12 2,269 <br />East Leg <br />Approach 0 0 0 0 0 0 0 0 <br />Departure 0 0 0 0 0 0 0 0 <br />Total 0 0 0 0 0 0 0 0 <br />West Leg <br />Approach 914 0 4 918 890 0 12 902 <br />Departure 0 0 0 0 0 0 0 0 <br />Total 914 0 4 918 890 0 12 902 <br />Total Approaches <br />Approach 1,971 0 4 1,975 2,257 0 12 2,269 <br />Departure 1,971 0 4 1,975 2,257 0 12 2,269 <br />Total 3,942 0 8 3,950 4,513 0 24 4,537 <br />The Addington <br />Table B-2 - Opening Year Cumulative With Option E - Main Street and Walkie Way-Santiago Park-Driveway Access <br />AM Peak Hour PM Peak Hour <br />and Discovery Cube Peak Hour Volume Summary <br />Analysis\OY P TM Santiago - 9/12/2019 <br />2-258
The URL can be used to link to this page
Your browser does not support the video tag.