My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
10-28-19
>
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 2:52:36 PM
Creation date
2/13/2020 2:48:40 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
726
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Resolution No. 2019-xx <br />Page 6 of 10 <br />WHEREAS, the City has prepared “Clarifications to the Final EIR (October <br />2019)” to determine if the October Modified Project would result in new or substantially <br />increased environmental effects than those analyzed in the EIR such that the EIR would <br />require recirculation prior to its certification; and <br /> <br />WHEREAS, the Clarifications to the Final EIR include detailed analysis, based <br />upon substantial evidence, that demonstrate that the October Modified Project would <br />not result in any new or substantially greater impacts than are disclosed in the EIR, no <br />new mitigation measures beyond those identified in the EIR are required, and no <br />additional feasible alternatives or mitigation measures considerably different from others <br />previously analyzed would clearly lessen the significant environmental impacts of the <br />project; and <br /> <br />WHEREAS, October 18, 2019, the City gave public notice of a Planning <br />Commission public hearing for consideration of Environmental Impact Report No. 2018- <br />01 (State Clearinghouse Number #2018021031) by advertising in the Orange County <br />Register a newspaper of general circulation, and on October 17, 2019 by mailing to <br />owners of property and residents within 500 feet of the Project and posting on the <br />project site; and <br /> <br />WHEREAS, on October 28, 2019, the Planning Commission held a public <br />hearing for consideration of Environmental Impact Report No. 2018-01 (State <br />Clearinghouse Number #2018021031), and Clarifications to the EIR, at which time all <br />persons wishing to testify were heard and the Project was fully considered; and <br /> <br />WHEREAS, the “EIR” consists of the Final EIR, Clarifications to the Final EIR, <br />and all attachments and appendices to both the Final EIR and the Clarifications to the <br />Final EIR, as well as the Draft EIR and its attachments and appendices (as modified by <br />the Final EIR); and <br /> <br />WHEREAS, all potentially significant adverse environmental impacts were <br />sufficiently analyzed in the EIR; and <br /> <br />WHEREAS, as contained herein, the Planning Commission has endeavored in <br />good faith to set forth the basis for its decision and recommendations on the Project; <br />and <br />WHEREAS, all of the requirements of the Public Resources Code and the State <br />CEQA Guidelines have been satisfied by the City in connection with the preparation of <br />the EIR, which is sufficiently detailed so that all of the potentially significant <br />environmental effects of the Project have been adequately evaluated; and <br />WHEREAS, all of the findings and conclusions made by the Planning <br />Commission pursuant to this Resolution are based upon the oral and written evidence <br />presented to it as a whole and the entirety of the administrative record for the Project, <br />2-26
The URL can be used to link to this page
Your browser does not support the video tag.