My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
10-28-19
>
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 2:52:36 PM
Creation date
2/13/2020 2:48:40 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
726
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HCM 6th AWSC <br />13: Bush St/Driveway 2 & Edgewood Rd 09/03/2019 <br />The Addington 09/03/2019 Existing Conditions - AM Peak hour Synchro 10 Report <br />Page 9 <br />Intersection <br />Intersection Delay, s/veh 8.6 <br />Intersection LOS A <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 2 96 67 0 180 0 58 01000 <br />Future Vol, veh/h 2 96 67 0 180 0 58 01000 <br />Peak Hour Factor 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 <br />Heavy Vehicles, % 2 22222222222 <br />Mvmt Flow 2 116 81 0 217 0 70 01000 <br />Number of Lanes 0 10010010010 <br />Approach EB WB NB SB <br />Opposing Approach WB EB SB NB <br />Opposing Lanes 1 1 1 1 <br />Conflicting Approach Left SB NB EB WB <br />Conflicting Lanes Left 1 1 1 1 <br />Conflicting Approach RightNB SB WB EB <br />Conflicting Lanes Right 1 1 1 1 <br />HCM Control Delay 8.3 8.8 8.6 0 <br />HCM LOS A A A - <br /> <br />Lane NBLn1EBLn1WBLn1SBLn1 <br />Vol Left, %98% 1% 0% 0% <br />Vol Thru, %0% 58% 100% 100% <br />Vol Right, %2% 41% 0% 0% <br />Sign Control Stop Stop Stop Stop <br />Traffic Vol by Lane 59 165 180 0 <br />LT Vol 58 2 0 0 <br />Through Vol 0 96 180 0 <br />RT Vol 1 67 0 0 <br />Lane Flow Rate 71 199 217 0 <br />Geometry Grp 1111 <br />Degree of Util (X) 0.099 0.226 0.26 0 <br />Departure Headway (Hd) 5.01 4.101 4.314 4.929 <br />Convergence, Y/N Yes Yes Yes Yes <br />Cap 717 879 835 0 <br />Service Time 3.031 2.115 2.327 2.955 <br />HCM Lane V/C Ratio 0.099 0.226 0.26 0 <br />HCM Control Delay 8.6 8.3 8.8 8 <br />HCM Lane LOS A A A N <br />HCM 95th-tile Q 0.3 0.9 1 0 <br />2-300
The URL can be used to link to this page
Your browser does not support the video tag.