Laserfiche WebLink
HCM Signalized Intersection Capacity Analysis <br />9: Main St & I-5 NB Ramps/Edgewood Rd 09/03/2019 <br />The Addington 09/03/2019 Existing Conditions - PM Peak hour Synchro 10 Report <br />Page 2 <br />Movement NWR NWR2 <br />Lane Configurations <br />Traffic Volume (vph) 296 6 <br />Future Volume (vph) 296 6 <br />Ideal Flow (vphpl)1900 1900 <br />Total Lost time (s)4.5 <br />Lane Util. Factor 0.88 <br />Frt 0.85 <br />Flt Protected 1.00 <br />Satd. Flow (prot)2787 <br />Flt Permitted 1.00 <br />Satd. Flow (perm)2787 <br />Peak-hour factor, PHF 0.97 0.97 <br />Adj. Flow (vph) 305 6 <br />RTOR Reduction (vph) 0 0 <br />Lane Group Flow (vph) 311 0 <br />Turn Type Prot <br />Protected Phases 9 <br />Permitted Phases <br />Actuated Green, G (s) 18.1 <br />Effective Green, g (s) 18.1 <br />Actuated g/C Ratio 0.15 <br />Clearance Time (s)4.5 <br />Vehicle Extension (s) 3.0 <br />Lane Grp Cap (vph) 420 <br />v/s Ratio Prot c0.11 <br />v/s Ratio Perm <br />v/c Ratio 0.74 <br />Uniform Delay, d1 48.7 <br />Progression Factor 1.00 <br />Incremental Delay, d2 6.9 <br />Delay (s) 55.6 <br />Level of Service E <br />Approach Delay (s) <br />Approach LOS <br />Intersection Summary <br />2-314