Laserfiche WebLink
HCM 6th Signalized Intersection Summary <br />7: Main St & Walkie Way/Project Driveway 09/13/2019 <br />The Addington 09/12/2019 Existing With Option E Main/Walkie Way and Surface Parking - AM Peak hour Synchro 10 Report <br />Page 3 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (veh/h) 2 0 1 44 0 30 19 1249 16 11 1351 11 <br />Future Volume (veh/h) 2 0 1 44 0 30 19 1249 16 11 1351 11 <br />Initial Q (Qb), veh 000000000000 <br />Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Work Zone On Approach No No No No <br />Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 <br />Adj Flow Rate, veh/h 2 0 1 48 0 33 21 1373 18 12 1485 12 <br />Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 <br />Percent Heavy Veh, %222222222222 <br />Cap, veh/h 387 0 344 74 0 66 29 2997 39 19 2985 24 <br />Arrive On Green 0.22 0.00 0.22 0.04 0.00 0.04 0.02 0.58 0.58 0.01 0.57 0.57 <br />Sat Flow, veh/h 1781 0 1585 1781 0 1585 1781 5194 68 1781 5225 42 <br />Grp Volume(v), veh/h 2 0 1 48 0 33 21 900 491 12 968 529 <br />Grp Sat Flow(s),veh/h/ln 1781 0 1585 1781 0 1585 1781 1702 1858 1781 1702 1863 <br />Q Serve(g_s), s 0.1 0.0 0.1 3.5 0.0 2.6 1.5 19.8 19.8 0.9 22.1 22.1 <br />Cycle Q Clear(g_c), s 0.1 0.0 0.1 3.5 0.0 2.6 1.5 19.8 19.8 0.9 22.1 22.1 <br />Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.04 1.00 0.02 <br />Lane Grp Cap(c), veh/h 387 0 344 74 0 66 29 1964 1072 19 1945 1064 <br />V/C Ratio(X) 0.01 0.00 0.00 0.65 0.00 0.50 0.72 0.46 0.46 0.62 0.50 0.50 <br />Avail Cap(c_a), veh/h 387 0 344 343 0 305 96 1964 1072 82 1945 1064 <br />HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Upstream Filter(I)1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 0.67 0.67 0.67 <br />Uniform Delay (d), s/veh 39.9 0.0 39.9 61.4 0.0 61.0 63.6 15.8 15.8 64.0 16.7 16.7 <br />Incr Delay (d2), s/veh 0.0 0.0 0.0 9.3 0.0 5.9 28.2 0.8 1.4 20.0 0.6 1.1 <br />Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br />%ile BackOfQ(50%),veh/ln 0.1 0.0 0.0 1.8 0.0 1.2 0.9 7.6 8.5 0.5 8.5 9.5 <br />Unsig. Movement Delay, s/veh <br />LnGrp Delay(d),s/veh 39.9 0.0 39.9 70.7 0.0 66.9 91.8 16.6 17.2 84.0 17.3 17.8 <br />LnGrp LOS D A D E A E F B B F B B <br />Approach Vol, veh/h 3 81 1412 1509 <br />Approach Delay, s/veh 39.9 69.1 17.9 18.0 <br />Approach LOS D E B B <br />Timer - Assigned Phs 2 3 4 6 7 8 <br />Phs Duration (G+Y+Rc), s 33.2 7.1 79.3 10.4 6.4 80.0 <br />Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 5.0 5.0 <br />Max Green Setting (Gmax), s 4.0 7.0 73.0 25.0 6.0 75.0 <br />Max Q Clear Time (g_c+I1), s 2.1 3.5 24.1 5.5 2.9 21.8 <br />Green Ext Time (p_c), s 0.0 0.0 14.6 0.2 0.0 13.2 <br />Intersection Summary <br />HCM 6th Ctrl Delay 19.4 <br />HCM 6th LOS B <br />2-316