My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
10-28-19
>
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 2:52:36 PM
Creation date
2/13/2020 2:48:40 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
726
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HCM 6th Signalized Intersection Summary <br />15: Lawson Way/SR-22 EB Ramps & Town and Country Road 10/06/2019 <br />The Addington 09/12/2019 OY Cumulative With Option E Main St/Walkie Way and Surface Parking - AM Peak hour Synchro 10 Report <br />Page 1 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (veh/h) 343 133 170 99 128 132 95 184 28 328 302 646 <br />Future Volume (veh/h) 343 133 170 99 128 132 95 184 28 328 302 646 <br />Initial Q (Qb), veh 000000000000 <br />Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Work Zone On Approach No No No No <br />Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 <br />Adj Flow Rate, veh/h 385 149 191 111 144 148 107 207 31 369 629 532 <br />Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 <br />Percent Heavy Veh, %222222222222 <br />Cap, veh/h 365 187 240 137 790 352 356 621 92 485 509 431 <br />Arrive On Green 0.11 0.25 0.25 0.08 0.22 0.22 0.20 0.20 0.20 0.27 0.27 0.27 <br />Sat Flow, veh/h 3456 744 954 1781 3554 1585 1781 3106 458 1781 1870 1585 <br />Grp Volume(v), veh/h 385 0 340 111 144 148 107 117 121 369 629 532 <br />Grp Sat Flow(s),veh/h/ln 1728 0 1699 1781 1777 1585 1781 1777 1788 1781 1870 1585 <br />Q Serve(g_s), s 9.5 0.0 16.9 5.5 3.0 7.2 4.6 5.1 5.2 17.1 24.5 24.5 <br />Cycle Q Clear(g_c), s 9.5 0.0 16.9 5.5 3.0 7.2 4.6 5.1 5.2 17.1 24.5 24.5 <br />Prop In Lane 1.00 0.56 1.00 1.00 1.00 0.26 1.00 1.00 <br />Lane Grp Cap(c), veh/h 365 0 427 137 790 352 356 355 358 485 509 431 <br />V/C Ratio(X) 1.06 0.00 0.80 0.81 0.18 0.42 0.30 0.33 0.34 0.76 1.24 1.23 <br />Avail Cap(c_a), veh/h 365 0 427 137 790 352 356 355 358 485 509 431 <br />HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Uniform Delay (d), s/veh 40.3 0.0 31.6 40.9 28.4 30.0 30.6 30.8 30.9 30.1 32.8 32.8 <br />Incr Delay (d2), s/veh 62.5 0.0 14.3 29.9 0.5 3.7 2.2 2.5 2.5 10.7 122.0 123.6 <br />Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br />%ile BackOfQ(50%),veh/ln 7.1 0.0 8.4 3.5 1.3 3.1 2.2 2.4 2.5 8.6 28.0 23.9 <br />Unsig. Movement Delay, s/veh <br />LnGrp Delay(d),s/veh 102.7 0.0 45.9 70.8 28.9 33.7 32.8 33.3 33.4 40.8 154.8 156.3 <br />LnGrp LOS F A D E CCCCCDFF <br />Approach Vol, veh/h 725 403 345 1530 <br />Approach Delay, s/veh 76.1 42.2 33.2 127.8 <br />Approach LOS E D C F <br />Timer - Assigned Phs 1 2 4 5 6 8 <br />Phs Duration (G+Y+Rc), s 11.4 27.1 29.0 14.0 24.5 22.5 <br />Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 <br />Max Green Setting (Gmax), s 6.9 22.6 24.5 9.5 20.0 18.0 <br />Max Q Clear Time (g_c+I1), s 7.5 18.9 26.5 11.5 9.2 7.2 <br />Green Ext Time (p_c), s 0.0 0.7 0.0 0.0 1.0 1.2 <br />Intersection Summary <br />HCM 6th Ctrl Delay 93.0 <br />HCM 6th LOS F <br />Notes <br />User approved volume balancing among the lanes for turning movement. <br />2-355
The URL can be used to link to this page
Your browser does not support the video tag.