Laserfiche WebLink
HCM 6th Signalized Intersection Summary <br />7: Main St & Santiago Park/Project Driveway 09/13/2019 <br />The Addington 09/12/2019 OY Cumulative With Option E - Main St./Walkie Way and Surface Parking - PM Peak hour Synchro 10 Report <br />Page 4 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (veh/h) 8 0 21 29 0 19 29 1444 45 31 1621 2 <br />Future Volume (veh/h) 8 0 21 29 0 19 29 1444 45 31 1621 2 <br />Initial Q (Qb), veh 0 00000000000 <br />Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Work Zone On Approach No No No No <br />Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 <br />Adj Flow Rate, veh/h 9 0 23 31 0 20 31 1553 48 33 1743 2 <br />Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 <br />Percent Heavy Veh, % 2 22222222222 <br />Cap, veh/h 387 0 345 50 0 45 39 2936 91 42 3047 3 <br />Arrive On Green 0.22 0.00 0.22 0.03 0.00 0.03 0.02 0.58 0.58 0.02 0.58 0.58 <br />Sat Flow, veh/h 1781 0 1585 1781 0 1585 1781 5089 157 1781 5267 6 <br />Grp Volume(v), veh/h 9 0 23 31 0 20 31 1039 562 33 1126 619 <br />Grp Sat Flow(s),veh/h/ln1781 0 1585 1781 0 1585 1781 1702 1842 1781 1702 1869 <br />Q Serve(g_s), s 0.5 0.0 1.5 2.2 0.0 1.6 2.3 24.2 24.2 2.4 27.1 27.1 <br />Cycle Q Clear(g_c), s 0.5 0.0 1.5 2.2 0.0 1.6 2.3 24.2 24.2 2.4 27.1 27.1 <br />Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.09 1.00 0.00 <br />Lane Grp Cap(c), veh/h 387 0 345 50 0 45 39 1964 1063 42 1969 1081 <br />V/C Ratio(X) 0.02 0.00 0.07 0.62 0.00 0.45 0.79 0.53 0.53 0.79 0.57 0.57 <br />Avail Cap(c_a), veh/h 387 0 345 343 0 305 96 1964 1063 82 1969 1081 <br />HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 0.54 0.54 0.54 <br />Uniform Delay (d), s/veh40.0 0.0 40.4 62.5 0.0 62.2 63.3 16.7 16.7 63.1 17.3 17.3 <br />Incr Delay (d2), s/veh 0.1 0.0 0.4 11.6 0.0 6.8 28.4 1.0 1.9 15.8 0.7 1.2 <br />Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br />%ile BackOfQ(50%),veh/ln0.2 0.0 0.6 1.2 0.0 0.7 1.3 9.5 10.6 1.3 10.6 11.8 <br />Unsig. Movement Delay, s/veh <br />LnGrp Delay(d),s/veh 40.1 0.0 40.8 74.1 0.0 69.0 91.7 17.8 18.6 78.9 17.9 18.5 <br />LnGrp LOS D A D E A E F BBEBB <br />Approach Vol, veh/h 32 51 1632 1778 <br />Approach Delay, s/veh 40.6 72.1 19.5 19.2 <br />Approach LOS D E B B <br />Timer - Assigned Phs 2 3 4 6 7 8 <br />Phs Duration (G+Y+Rc), s 33.3 7.9 80.2 8.7 8.1 80.0 <br />Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 5.0 5.0 <br />Max Green Setting (Gmax), s 4.0 7.0 73.0 25.0 6.0 75.0 <br />Max Q Clear Time (g_c+I1), s 3.5 4.3 29.1 4.2 4.4 26.2 <br />Green Ext Time (p_c), s 0.0 0.0 19.2 0.1 0.0 17.4 <br />Intersection Summary <br />HCM 6th Ctrl Delay 20.3 <br />HCM 6th LOS C <br />2-359