My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
10-28-19
>
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 2:52:36 PM
Creation date
2/13/2020 2:48:40 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
726
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HCM Signalized Intersection Capacity Analysis <br />9: Main St & Edgewood Rd 09/03/2019 <br />The Addington 09/03/2019 Year 2040 Conditions - AM Peak hour Synchro 10 Report <br />Page 1 <br />Movement WBL WBR NBT NBR SBL2 SBL SBT NWL NWR NWR2 <br />Lane Configurations <br />Traffic Volume (vph) 160 101 688 98 71 0 1658 0 726 24 <br />Future Volume (vph) 160 101 688 98 71 0 1658 0 726 24 <br />Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br />Total Lost time (s)4.5 4.5 4.5 4.5 4.5 4.5 <br />Lane Util. Factor 1.00 1.00 0.91 1.00 0.91 0.88 <br />Frt 1.00 0.85 0.98 1.00 1.00 0.85 <br />Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (prot)1770 1583 4990 1770 5085 2787 <br />Flt Permitted 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (perm)1770 1583 4990 1770 5085 2787 <br />Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 <br />Adj. Flow (vph) 168 106 724 103 75 0 1745 0 764 25 <br />RTOR Reduction (vph) 0 90 00000000 <br />Lane Group Flow (vph) 168 16 827 0 75 0 1745 0 789 0 <br />Turn Type Prot Perm NA Prot NA Prot <br />Protected Phases 32169 <br />Permitted Phases 8 <br />Actuated Green, G (s) 15.0 15.0 35.2 7.8 47.5 34.0 <br />Effective Green, g (s) 15.0 15.0 35.2 7.8 47.5 34.0 <br />Actuated g/C Ratio 0.14 0.14 0.32 0.07 0.43 0.31 <br />Clearance Time (s)4.5 4.5 4.5 4.5 4.5 4.5 <br />Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 <br />Lane Grp Cap (vph) 241 215 1596 125 2195 861 <br />v/s Ratio Prot c0.09 0.17 0.04 c0.34 c0.28 <br />v/s Ratio Perm 0.01 <br />v/c Ratio 0.70 0.08 0.52 0.60 0.79 0.92 <br />Uniform Delay, d1 45.3 41.4 30.5 49.6 27.0 36.6 <br />Progression Factor 1.00 1.00 0.42 1.00 1.00 1.00 <br />Incremental Delay, d2 8.5 0.1 1.1 7.5 3.1 14.2 <br />Delay (s)53.8 41.6 14.0 57.1 30.1 50.9 <br />Level of Service D D B E C D <br />Approach Delay (s) 49.1 14.0 31.2 50.9 <br />Approach LOS D B C D <br />Intersection Summary <br />HCM 2000 Control Delay 32.9 HCM 2000 Level of Service C <br />HCM 2000 Volume to Capacity ratio 0.86 <br />Actuated Cycle Length (s) 110.0 Sum of lost time (s)18.0 <br />Intersection Capacity Utilization 59.2% ICU Level of Service B <br />Analysis Period (min)15 <br />c Critical Lane Group <br />2-374
The URL can be used to link to this page
Your browser does not support the video tag.