My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT WITH DN TANKS FOR INSTALLATION AND DESIGN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
02/18/2020
>
25B - AGMT WITH DN TANKS FOR INSTALLATION AND DESIGN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:00:59 PM
Creation date
2/13/2020 4:23:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
2/18/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OYK and Natgun <br />Generation. Strong <br />Michael J. Dufresne, P.E. <br />Construction Manager <br />Professional Exuerience <br />DN Tanks, Inc., El Cajon, CA <br />(DYKlncoiporated merged with Natgun Corporation to form DNTanks in December 2010) <br />2018 - Present Construction Manager — Responsible for overseeing DN Tanks' Western construction <br />division including all office and field persoinel related to construction. <br />2003 - 2018 Project Manager — Responsible for organizing, directing, and executing DN Tanks' <br />projects in accordance with contract drawings and specifications, DN Tanks final tank <br />drawings, and DN Tanks' Construction and Safety procedures. Responsible for all <br />submissions to the consulting engineer, including monthly pay requisitions, shop <br />drawing submittals, material specification submittals, etc. Act as a liaison between DN <br />Tanks management and the field personnel, discussing and acting on all aspects of DN <br />Tanks' projects. Attend project management meetings, prepare site layout plan, obtain <br />subcontractors for various portions of the work, monitor quality control and safety <br />through daily communication with the superintendent, and periodic site visits. Act as <br />DN Tanks representative to the project owner and engineer striving to maintain their <br />satisfaction while maintaining DN Tanks' interests. <br />2000 — 2003 Project Engineer — Provides office support to project managers. Evaluates and issues <br />request for quotes and purchase orders. Prepares concrete mix design submittals; <br />checks Natgun material purchase orders; prepares shoring drawings and site layouts; <br />prepares Natgun and subcontract submittals; obtains ready -mix supplier bid <br />information; snakes site progress and quality control inspections; snakes daily <br />manpower entries and projections. <br />Northeastern University, Boston MA <br />1998 - 2000 Cooperative Education Program Assignments <br />Camp, Dresser & McKee, Inc., Fort Lauderdale, FL — Assisted in the design and <br />testing of a membrane water treatment plant for the City of Boca Raton. Under the <br />supervision of the Project Engineer, assisted in testing and recording data of the <br />membrane pilot plant at the water treatment plant. Assisted with the design of the high <br />service pump building, degasifying unit, and strainers for the membranes. <br />Simpson, Gumpertz and Heger, Inc., Arlington, MA — Responsible for the <br />monitoring of waterproofing repairs under the supervision of the project engineer. <br />Completed flood tests, daily field reports, and documentation of the job site. Assisted <br />in the laboratory with the testing of materials, including compiling reports and quantity <br />take -offs. Assisted on investigative work for a roof collapse. <br />25B-26 5p <br />
The URL can be used to link to this page
Your browser does not support the video tag.