My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT WITH DN TANKS FOR INSTALLATION AND DESIGN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
02/18/2020
>
25B - AGMT WITH DN TANKS FOR INSTALLATION AND DESIGN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:00:59 PM
Creation date
2/13/2020 4:23:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
2/18/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
these options in an effort to try and eliminate the need forth e City to drain the two concrete <br />reservoirs with precast concrete roofs. <br />DN Tanks proposal pricing includes performing work inside of the drained tanks in accordance <br />with the preliminary design details. DN Tanks base price in Attachment 2: Fee Schedule does <br />not include the cost of disinfecting the tank, however a breakout price for tank disinfection <br />has been included in an Appendix to the Fee Schedule with additional pricing. <br />We assume that the City will be responsible for all filling and draining of these tanks for the <br />work to be performed. <br />e. Assumptions and Clarifications <br />DN Tanks has assumed the following items in preparing our pricing: <br />1) Tank draining and filling to be provided by the City. <br />2) Cleaning of the tanks is not included in DN Tanks price but can be provided for an <br />additional fee. <br />3) It is assumed there are no utilities that need to be relocated in order to install the davit <br />anchor support system as shown in the preliminary feasibility study. Relocation of utilities <br />or design alterations to avoid existing utilities is considered a changed condition. <br />a. DN Tanks will conduct a review of the as-builts and existing site conditions to <br />confirm existing conditions. <br />4) It is assumed there will be no rock excavation. Rock excavation will be a changed <br />condition. <br />5) Special inspection, if required, to be provided by the City at no cost to DN Tanks. <br />Page 3 of 3 <br />25B-37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.