My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT WITH DN TANKS FOR INSTALLATION AND DESIGN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
02/18/2020
>
25B - AGMT WITH DN TANKS FOR INSTALLATION AND DESIGN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:00:59 PM
Creation date
2/13/2020 4:23:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
2/18/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
finality In-oject, both nor -thee and it itbin GurlSet. to extend <br />tie life of this tank for unary year. bran the initial inspection <br />though project completion, the attentiveness of DN 7nikr <br />war a pleajnre." <br />- UARIURAAI110FER. P,?h, lhoif l).- <br />When's the last time your tank had a checkup? <br />Whether you have a specific issue or just need to schedule a routine inspection to meet regulatory <br />requirements, your CTS team will start with a thorough evaluation of your tank. <br />Once the inspection is complete, we analyze the findings and present them in a comprehensive, <br />bound Inspection Report that is certified by one of our engineers. <br />Not only will it include our observations and recommendations, but the associated costs as well. <br />We'll make your old tank look like new again - inside and out. <br />We provide rehabilitation services for all different types of concrete tanks. Whether the issue is <br />cosmetic, structural, operational, safety -related or if your facility is simply due for an upgrade, you <br />can count on ON Tanks to come in, provide you with an accurate assessment, budget and project plan. <br />Often, time is of the essence. Particularly if the rehabilitation is addressing a water quality issue. <br />We are accustomed to tight deadlines and will work with you to make sure the job is done right <br />and on time. <br />Improve performance, ensure compliance and extend the life <br />of your concrete tank. <br />If your concrete tank needs to be retrofitted in order to comply with new regulatory requirements <br />or simply to improve performance and better manage demand, we have the experience to get it right. <br />Every job requires some level of customization to ensure that it's clone correctly and will last for <br />generations to come. From a simple safety handrail system to a complete seismic upgrade, we <br />bring the same level of commitment and expertise to every job. <br />
The URL can be used to link to this page
Your browser does not support the video tag.