Laserfiche WebLink
Appendix <br />ATTACHMENT 2: FEE SCHEDULE <br />BID PRICING SHEET <br />Pricing must be inclusive of all costs, including but not limited to, direct and indirect costs <br />for labor, overhead, incidental supplies, travel, mileage, taxes as applicable and fuel. This <br />contract is subiect to prevailing wages. <br />QTY/UOM <br />BID ITEM <br />UNIT <br />PRICE <br />EXTENDED <br />PRICE <br />1. <br />1 ea <br />Davit 1 —West Pump Station (Steel <br />Tank Roof Connection) <br />$ 48,400 <br />$ 48,400 <br />2. <br />1 ea <br />Davit 2 — East Pump Station (Steel <br />Tank Roof Connection) <br />$ 48,400 <br />$ 48,400 <br />3. <br />1 ea <br />Davit 3 — South Pump Station <br />(Precast Panel Roof Connection) <br />$ 37,800 <br />$ 37,800 <br />14. <br />1 ea <br />Davit 4 — South Pump Station (Pole Footing) <br />$ 20,800 <br />$- 20,800 <br />5. <br />1 ea <br />Davit 5 — Garthe Pump Station <br />(Concrete Pad Dowel into Roof Deck) <br />$ 15.100 <br />$ 15,100 <br />6. <br />1 ea <br />Davit 6 — Garthe Pump Station <br />(Concrete Pad Dowel into Roof Deck <br />$ 15,100 <br />$ 15,100 <br />7. <br />1 ea <br />Davit 7 — Garthe Pump Station (Pole <br />Footing) <br />$ 20,800 <br />$ zo,800 <br />8. <br />1 ea <br />Davit 8 — Garthe Pump Station <br />(Concrete Pad Dowel into Roof Deck) <br />$ 15,100 <br />$ 15,100 <br />9. <br />1 ea <br />Davit 9 — Garthe Pump Station (Pole <br />Footing <br />$ 20,800 <br />$ 20,800 <br />10. <br />1 ea <br />Davit 10 — Crooke Pump Station <br />(Foundation to Roof Deck) <br />$ 27,900 <br />$ 27,900 <br />11. <br />1 ea <br />Davit 11 — Cambridge Pump Station <br />(Pole Footing) <br />$ zo>800 <br />$ 20,800 <br />12. <br />1 ea <br />Davit 12 — Cambridge Pump Station <br />(Precast Panel Roof Connection) <br />$ 37,800 <br />$ 37,800 <br />13. <br />1 ea <br />Davit 13 — Segerstrom Lift Station <br />(Foundation to Roof Deck) <br />$ 27,600 <br />$ 27,600 <br />14. <br />1 ea <br />Davit 14 — Maxine Pump Station <br />(Foundation to Roof Deck) <br />$ 27,600 <br />$ 27,600 <br />Total <br />$ 384,000 <br />IVFUUY OYI UV IV Nui IVI II, acre "U A III accuroance with the terms and conditions set forth in the above reference <br />City of Santa Ana - RFP 19-097 <br />25B-53 e <br />