My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
80A - PH AGMT WITH COUNTY OF ORANGE 65 YR GROUND LEASE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
02/18/2020
>
80A - PH AGMT WITH COUNTY OF ORANGE 65 YR GROUND LEASE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:09:20 PM
Creation date
2/13/2020 4:59:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
80A
Date
2/18/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
parcel (County -owned parcel). The five original buildings located on the site <br />were demolished in the 1990s by CalTrans during a freeway -widening project. <br />As a vacant and undeveloped site, there is an opportunity to imagine a newly <br />designed site that will truly meet the needs of the local community. The entire <br />site is designated District Center (DC) in the City of Santa Ana 1998 General <br />Plan and zoned Transit Village (TV) in the Transit Zoning Code. The proposed <br />Project includes the development of one residential building, subdivided into <br />three (3) residential portions, with 86 units surrounding two interior <br />landscaped courtyard and amenity spaces. Developed at an overall density of <br />37.7 units per acre, there will be 16 studios, 26 one -bedrooms units, 22 two - <br />bedroom units, 17 three -bedroom units, and 5 four -bedroom units. All units <br />will be apartments located on the first, second, and third floors. <br />(9) Total Budget: <br />This Activity will use $963,951 in NSP 1, 2 and 3 Program funds. <br />(10) Performance Measures <br />The Project will be 100% affordable to households earning no more than 30 <br />percent of Area Median Income (AMI) of which 43 units will be set - aside for <br />Permanent Supportive Housing, with one exempt 2-bedroom manager's unit. <br />The large bedroom units align with the City's priorities and needs while the <br />Permanent Supportive Housing units meets the County's priorities. The <br />proposed unit mix and rent restrictions are as follows: <br />Bedroom <br />Size <br />30% <br />AMI (PSH) <br />30%AMI <br />Manager's <br />Unit <br />Total Units <br />Studios <br />16 <br />16 <br />One -Bedroom <br />26 <br />26 <br />Two -Bedroom <br />1 <br />20 <br />1 <br />22 <br />Three -Bedroom <br />17 <br />17 <br />Four -Bedroom <br />1 <br />1 6 <br />1 <br />1 6 <br />TOTAL <br />1 43 <br />1 42 <br />1 1 <br />1 86 <br />80A- 298 <br />
The URL can be used to link to this page
Your browser does not support the video tag.