Laserfiche WebLink
Pedro A. Garcia <br />DP No. 2018-06R <br />Master ID No. 2018-141605 <br />September 27, 2019 <br /> <br /> <br />Page 14 of 15 <br /> <br />15) All non-residential irrigated landscapes of 1,000 square feet and residential irrigated <br />landscapes of 5,000 square feet or more require a separate landscape irrigation water <br />meter & service of proper size to supply the project’s landscape irrigation system. <br /> <br />16) The City of Santa Ana recommends the use of Weather Based Irrigation <br />Controllers” Smart Timers” and Rotating Nozzles for Pup-up Spray Heads to be <br />used on your irrigation systems. For a listing of approved equipment and possible <br />rebates, please go to www.BEWATERWISE.com <br /> <br />17) The Developer shall install new, relocate, or upgrade existing Fire Protection <br />Facilities as required by the Orange County Fire Authority (OCFA), City Standards <br />and approved plans, following the completion of a water service application and the <br />issuance of a Public Works Encroachment Permit. A licensed contractor that <br />possesses either an “A” or “C–34” California Contractor’s license shall install the <br />fire protection facilities. Demand calculations in gallon per minute for size <br />determination are required. <br /> <br />Contact OCFA Plan Check at (714) 573-6126 for assistance. <br /> <br />(Please obtain latest list of approved backflow prevention assemblies from USC <br />foundation for Cross Connection Control and Hydraulic Research.) <br /> <br /> General requirements (Sewer) <br /> <br />18) The Developer shall install new sewer lateral(s) per City Standards and approved <br />plans, following the issuance of a Public Works Encroachment Permit. A licensed <br />contractor that possesses an “A”, C-34, or “C-36” California Contractors license <br />shall install the sewer lateral. <br /> <br />a. Any existing and unused sewer lateral(s) connected the project site shall be <br />properly capped and abandoned at the point of connection with the sewer <br />main subject to inspection and approval of the Water Resources Manager or <br />his designee. <br /> <br />Contact Water Division, at (714) 647-3320, for assistance. <br /> <br /> <br />IV. Prior to release of utilities or a Certificate of Occupancy, address the following items: <br /> <br />A) Planning Division: <br /> <br />1) The applicant shall contact the Case Planner to set up a Final Field Inspection <br />appointment. A three-day notice is required. The project must be completed before <br />final approval can be given. The Case Planner must sign the Building Permit Field <br />Card before Building Division will finalize any project. <br />