My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2 - CUP19-38_542 E CENTRAL AVENUE NOTICE PLANS
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
01-27-20
>
2 - CUP19-38_542 E CENTRAL AVENUE NOTICE PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:26:11 PM
Creation date
2/13/2020 5:25:56 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pedro Garcia <br />DP No. 2018-06 <br />Master I.D. No. 2018-141605 <br />December 3, 2019 <br /> <br /> <br />Page 7 of 8 <br /> <br />Contact OCFA Plan Check at (714) 573-6126 for assistance. <br /> <br />(Please obtain latest list of approved backflow prevention assemblies from USC <br />foundation for Cross Connection Control and Hydraulic Research.) <br /> <br /> General requirements (Sewer): <br /> <br />18) The Developer shall install new sewer lateral(s) per City Standards and approved <br />plans, following the issuance of a Public Works Encroachment Permit. A <br />licensed contractor that possesses an “A”, C-34, or “C-36” California Contractors <br />license shall install the sewer lateral. <br /> <br />a. Any existing and unused sewer lateral(s) connected the project site shall <br />be properly capped and abandoned at the point of connection with the <br />sewer main subject to inspection and approval of the Water Resources <br />Manager or his designee. <br /> <br />Contact Water Division, at (714) 647-3320, for assistance. <br /> <br />III. Prior to release of utilities or a Certificate of Occupancy, address the following items: <br /> <br />A) Planning Division: <br /> <br />1) The applicant shall contact the Case Planner to set up a Final Field Inspection <br />appointment. A three-day notice is required. The project must be completed <br />before final approval can be given. The Case Planner must sign the Building <br />Permit Field Card before Building Division will finalize any project. <br /> <br />B) Orange County Fire Authority (OCFA): <br /> <br />1) Prior to issuance of temporary or final certificate of occupancy, all OCFA <br />inspections shall be completed to the satisfaction of the OCFA inspector and be in <br />substantial compliance with codes and standards applicable to the project and <br />commensurate with the type of occupancy (temporary or final) requested. <br />Inspections shall be scheduled at least five days in advance by calling OCFA <br />Inspection Scheduling at 714-573-6150. <br /> <br />C) Public Works Agency: <br /> <br />1) Complete construction of all the required improvement in the public right-of-way <br />and provide a copy of the signed off street work permit. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.