Laserfiche WebLink
Pedro A. Garcia <br />DP No. 2018-06R <br />Master ID No. 2018-141605 <br />September 27, 2019 <br /> <br /> <br />Page 7 of 15 <br /> <br />B) Public Works Agency: <br /> <br />1) If applicable and requested herein as a requirement for Site Plan Approval, submit <br />Public Works Agency (PWA) requested documents, including WQMP, preliminary <br />grading plan, traffic impact analysis, drainage study, and hydrological study directly <br />to PWA Development Engineering. <br /> <br />Pay all related plan checking deposits for such documents at the Public Works <br />counter at the time of submittal. <br /> <br />2) Submit Exhibit “B” (Exceptions) of the title report. Revise the site plan to depict <br />and note all existing easements, per the current title report. Submit copies of all the <br />referenced and supporting documents defining each easement. Clarify easements on <br />the site plan and/or Alta/ACSM Land Title Survey. <br /> <br />NOTE: Structures are not allowed over existing easements or along a driving aisle. <br />The rights of the easement holder shall remain in effect without interference. If a <br />structure is proposed to be built over an easement, a signed non-interference letter <br />from the easement holder is required or easement holder must quitclaim rights to the <br />easement. An updated title report will be required if quitclaim process is selected. <br />The quitclaim(s) need(s) to be submitted to the Public Works Agency prior to any <br />permit issuance. <br /> <br />3) Include in the submittal separate sheets for each of the following: grading plan & <br />WQMP, on-site utility plan, and off-site utility plan & street improvement plan. <br /> <br />4) Revise the site plan to depict and note the installation of all public utilities required <br />to service the project site (i.e., new sewer lateral, water laterals, fire service, <br />irrigation laterals and storm drain). <br /> <br />NOTE: Connections to mains nor sizes are noted on plans. <br /> <br />5) Provide improvement plans for public utility connections of sewer, domestic water <br />and irrigation facility required to service the project site. Acknowledged and noted <br />on Sheet A-1.2. 8/20/19. SR <br /> <br />6) Revise the site plan to depict and note the locations and sizes of the water, sewer, <br />and storm drain mains on all streets surrounding the project frontages. <br /> <br />7) The existing water meter, as shown on the plans, cannot be used if the site has been <br />vacant for 10 years or more. Revise the site plan to depict the proposed project to be <br />served by individual public water meters for each and every separate unit, and for <br />the landscape area. Public Meter to be properly sized and to be placed at the <br />project’s frontage in public right-of-way. <br />