Laserfiche WebLink
4 <br />parking rate of 0.33 parking spaces per participant also includes 19 staff/employees <br />present on-site at the time of observed parking survey. As a conservative analysis, an <br />additional 10% is added to the parking demand to account for potential fluctuations in <br />parking demand. <br /> <br />As a result, a parking rate of 0.36 parking spaces per participant can be applied to the <br />proposed Easterseals Adult Care Center at Santa Ana. It should also be noted that the <br />parking rate includes staff parking. <br /> <br />Projected Parking Demand at Easterseals Adult Care Center, Santa Ana (Table 3): <br /> <br />The representatives of the project are proposing to have a total of twenty-five (25) <br />employees and forty (40) participants at the proposed Easterseals adult care facility, in the <br />city of Santa Ana. The difference between the employees between the two facilities is <br />expected to be six (6). <br /> <br />As a conservative analysis, by not taking any modal adjustments on the employee parking, <br />additional six (6) parking spaces has been added. The parking rate of 0.36 parking spaces <br />per participant and an additional 6 staff parking can be applied to the proposed Easterseals <br />Adult Care Center. See Table 3 below for details: <br /> <br />Table 3 <br />Projected Parking at Easterseals Adult Care Center, Santa Ana <br />Observed Peak <br />Parking Rate per <br />Participant <br />Maximum <br />Number of <br />Participants <br />Parking Spaces <br />Required <br />Additional Employee <br />Parking Required <br />(1 Space per Employee)1 <br />Total Projected <br />Parking Demand <br />Total Parking <br />Spaces Provided <br />On-site <br />Surplus <br />Parking <br />Spaces <br />0.36 40 14 6 20 36 16 <br />1 The difference of 6 staff members has been added without modal adjustments as a conservative analysis. <br /> <br />Projected Peak Parking Demand Findings: <br /> <br />As per the Table 3, the proposed Easterseals Adult Care Center at Santa Ana requires a total <br />of fourteen (14) parking spaces and the difference of six (6) staff parking requirement has <br />been added. Hence the total parking demand for the proposed projects is expected to be <br />twenty (20). The project provides a total of 36 parking spaces. As a result, a total of 16 <br />parking spaces are available during peak parking demand times. <br /> <br /> <br /> <br /> <br />4 - 49