My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT WITH CA BARRICADE RENTAL AND STATEWIDE TRAFFIC SIGNS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
03/03/2020
>
25E - AGMT WITH CA BARRICADE RENTAL AND STATEWIDE TRAFFIC SIGNS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2020 1:26:14 PM
Creation date
2/27/2020 12:52:03 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
3/3/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Appendix <br />ATTACHMENT1 <br />SCOPE OF WORK <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS <br />FOR <br />ON -CALL TRAFFIC CONTROL SERVICES <br />RFP NO.: 19-117 <br />Introduction / Background <br />The City of Santa Ana intends to retain traffic control specialist contractor(s) on an as -needed or <br />"on -call" basis. A Professional Services Agreement will be entered into with several of the <br />qualified contractor(s) to provide professional traffic control services for a variety of projects in <br />the City. <br />In general, work consists of general traffic control services. Each project may vary and each will <br />be based on task order assignment, the selected contractor(s) shall comply with all City, local, <br />State and Federal traffic related regulations. On occasions, the selected contractor(s) will be asked <br />to provide professional engineering traffic plans for specific task orders, based on an agreed -upon <br />specific scope of services and fees <br />Scope of Services <br />The work consists of temporary and permanent traffic control services and the necessary traffic <br />control devices, personnel and related equipment generally consisting of the following and not <br />limited to: <br />• Work area traffic control setup <br />• Job site flagging <br />• Lane closures <br />• Road closures <br />• Vehicle, bicycle and pedestrian detours <br />• Special event and traffic control <br />The City's Project Manager will notify the contractor(s) when traffic control services are needed. <br />The contractor(s) must be able to respond within a 48 hour period for planned services and within <br />2-hours of an emergency task order. <br />Note — Contractor(s) may be required to furnish material, equipment and supplies. Work may be <br />performed after hours which may require specific equipment for night time work <br />The Project manager or his/her(s) duly authorized representative will monitor the contractor(s) <br />operations and on periodic basis to assure compliance with proper traffic control and safety <br />procedures. <br />The selected contractor(s) must have the expertise, experience, and demonstrated resources <br />City of Sa�t� Fp 19-117 <br />4al� �- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.