My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT WITH CA BARRICADE RENTAL AND STATEWIDE TRAFFIC SIGNS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
03/03/2020
>
25E - AGMT WITH CA BARRICADE RENTAL AND STATEWIDE TRAFFIC SIGNS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2020 1:26:14 PM
Creation date
2/27/2020 12:52:03 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
3/3/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REA <br />r AFF saw s►o�ls <br />wwlw.statewidesafeiy, com <br />CA CONTRACTOR LICENSE 4975518 - CLASS A, C-31, C-32 & C-6ILD-42 DIR PW #1000001109 <br />Understanding of deed <br />Statewide Traffic Safety and Signs, Inc. <br />understands the safety of City of Santa Ana's <br />crews is a top priority for the City. We are <br />committed to providing a safe work zone for all <br />personnel involved and, with our experience <br />and expertise, we will provide the highest <br />standard of traffic control services to the City. <br />STSSI personnel will carry themselves in a <br />professional manner <br />Our 24hour on -call services wilt allow us to <br />respond when notified by the City's Project <br />Manager within 48 hours, for planned services, <br />as well as within 2 hours, for emergency task <br />orders. <br />Our Garden Grove branch is located minutes <br />from all locations within the limits of the City of <br />Santa Ana. We have shown on the map to the <br />right where our branch is located in relation to <br />Stat( 1nO T,4Nd f.h. and S,Fs <br />t� <br />"a <br />the City of Santa Ana. Our proximity to possible work locations under this contract will insure a prompt and <br />efficient response to traffic control requests from the City. <br />Material and equipment required for traffic control work under this contract will be staged on trucks, ready to <br />be dispatched with traffic control crews when task orders are initiated by the City's Project Manager. We <br />understand that after hours work may require additional equipment and have this equipment on standby as <br />well. STSSI vehicles will be clearly identified and fully equipped with all the necessary warning and flashing <br />signs to fulfill the task order. Traffic Mounted attenuators will be used on major arterial streets <br />As part of the contract requirements, STSSI will attend meetings with the City Staff as required. <br />We have extensive experience coordinate with regulatory agencies and will involve the respective agencies <br />representatives on site, if necessary. If the situation arises where unrelated work is concurrently be <br />performed on or near the work covered by this contract, STSSI will cooperate and coordinate as directed by <br />the City. <br />Our management and crews will monitor all traffic control setups to ensure proper functioning and repair <br />damaged or missing traffic control as necessary. In order to provide our services at a professional level, <br />STSSI has project management control procedures in place, that include project management plans, QA/QC <br />plans, project schedule/invoicing procedures„ and project correspondence procedures. <br />25E-51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.