My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT WITH HCI FOR FIRE PANEL IN PD
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
03/03/2020
>
25F - AGMT WITH HCI FOR FIRE PANEL IN PD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2020 1:26:28 PM
Creation date
2/27/2020 12:52:08 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
3/3/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HCI. Ontario * Burbank 9 San Diego * Irvine 9 Fresno 9 Sacramento 9 Hayward <br />���iii►►► Systems Inc. <br />Telephone: (877) 331-2084 Fax: (909) 628-7774 <br />DIRK: 1000000046 CA Contractor Lie: 905493 <br />Project: Santa Ana PD Fire Alarm Upgrade (Jail) Phase I <br />60 Civic Center Plaza <br />Santa Ana, CA. 92701 <br />Date: January 8, 2020 <br />FIRE ALARM PROPOSAL <br />HCI proposes to install a complete system(s) as described below. <br />This proposal is based on: JOB WALK ONLY <br />Dated <br />Drawings Section Through: N/A <br />Spec Section Through: Addendum A <br />SCOPE OF WORK <br />HCI proposes to upgrade the existing EST IRC fire alarm panels to the new EST-3, state of the art addressable fire <br />panels. HCI will replace these on a one to one basis. HCI will not perform any upgrades to the intiating devices or <br />visual alarms as part of this project. These to be done at a future time. <br />This Proposal is based upon the provided points list and photo's provided by Santa Ana PD. <br />This proposal excludes plan check, permit and inspection fees. HCI shall furnish asbuild drawings for the new <br />panels being installed. <br />This proposal excludes plan check, permit and inspection fees per your request. HCI shall furnish asbuild drawings <br />for the new panels being installed and equipment provided in this proposal only. <br />HCI proposes to furnish and install the fire alarm system with conduit, wire and boxes should any need to be <br />provided. <br />This proposal is based on a clean work flow with limited interuptions as well as easy access with the help of a Santa <br />Ana PD escort. <br />This proposal includes all HCI employees to be working on site will us the City required Live Scan fingerprinting <br />services at the cost to HCI. <br />This proposal includes prevailing page labor rates per specification. <br />Applicable taxes and freight are included. <br />This proposal includes a Cellular & POTS dialer (DACT) for connection to a 24 hour off -site monitoring facility. <br />Programming shall be provided at an additional cost if the owner selects to utilize a monitoring service other than <br />that provided by HCI. <br />This proposal will provide for the new panels to communicate with the old panels so the need for firewatch will be <br />limited as discussed on the bid walk dated 11/14/19. HCI will not provide firewatch for this project. This to be <br />provided by the City of Santa Ana and is excluded from this proposal. <br />Painting, patching, access hatches, fire caulking, fire stopping, underground raceway, trenching, X-Ray and coring <br />are excluded unless specifically listed below. <br />25F-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.