My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
60B - WASTE MANAGEMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
03/03/2020
>
60B - WASTE MANAGEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2020 4:39:35 PM
Creation date
2/27/2020 4:31:40 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
60B
Date
3/3/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Locking Bins - Contractor shall provide locking bin service to customers that request it at an <br />additional cost. See Section 4.3.12. <br />CITY GOVERNMENT OPERATIONS <br />City Facilities Collection (City Government Operations) - Contractor will collect and dispose <br />of all refuse, recyclables, and organic materials generated and accumulated at premises <br />owned and/or operated by the City at no additional charge (including e-waste, and <br />construction and demolition debris). Such premises include, but are not limited to, offices, <br />parks, and street maintenance operations. See Attachment 2-K for the current list of facilities <br />and service levels. The current contractor initiated food waste collection at several of the City <br />facilities, as shown in Attachment 2-K. It is the intent of the City that this service will be <br />offered at all City facilities generating food waste in the future. Note that these facilities and <br />service levels may vary over the term of the new agreement, with no increase in <br />compensation to the Contractor for additional collection services. See Sections 4.4.1 and 4.4.2. <br />City -Sponsored Events - The Contractor will be required to continue to provide refuse, <br />recyclables, and organics collection service at no charge at City -sponsored events. The <br />requirements and list of events is included in Section 4.4.3. Note that these events and service <br />levels may vary over the term of the new agreement, with no increase in compensation to the <br />Contractor for additional collection services. <br />Parkway Cleanup Following Garage Sales - Contractor will continue to provide two <br />employees in a front -loader vehicle for a combined 60 hours per quarter, each 6 working days <br />following the City s quarterly garage sales to remove debris left in parkways from the garage <br />sales. See Section 4.4.4. <br />Weekly Alley Cleanup - Contractor will continue to provide two employees in a front -loader <br />vehicle for 60 hours per week, each 6 working days each week to remove debris left in <br />alleyways. This service is increased to weekly, from 2 times per month in current agreement. <br />See Section 4.4.5. <br />Grant Administration - Contractor will continue to provide grant administration services on <br />behalf of the City for grants pursuant to those contained in AB 939 and/or adopted by <br />CalRecycle. The Contractor shall be reimbursed on an hourly basis for the grant <br />administrator's time at the rate agreed upon. See Section 4.4.6. <br />Emergency Services - Contractor will provide emergency services based on a rate which <br />includes one crew and one collection truck. Contractor to propose hourly rate in Attachment <br />3. <br />Battery Recycling Program - Contractor to provide as many battery recycling containers as <br />requested by City for placement at City facilities at no additional cost. Contractor shall collect <br />and replace containers upon City s request. See Section 4.4.8. See Attachment 12 for the <br />pounds of batteries collected through this program in calendar years 2015, 2016, 2017 and <br />2018 under the City s separate agreement for battery collection. <br />Draft, February 11, 2020 13 City of Santa Ana <br />60B-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.