My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DN TANKS INC.
Clerk
>
Contracts / Agreements
>
D
>
DN TANKS INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2022 2:23:40 PM
Creation date
3/4/2020 3:04:44 PM
Metadata
Fields
Template:
Contracts
Company Name
DN TANKS INC.
Contract #
A-2020-021
Agency
PUBLIC WORKS
Council Approval Date
2/18/2020
Expiration Date
2/17/2023
Insurance Exp Date
5/1/2023
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UT�YANKS <br />DYK end Natgun <br />Generations Strong <br />351 Cypress Lane, El Cajon, CA 1 619.440.8181 <br />Matthew D. Ford, P.E. <br />Regional Manager, CTS Western Region <br />Professional Experience <br />DN Tanks, El Cajon, California <br />(DYK incorporated nreiged with Natgun Corporation to form DN Tanis, Inc. in December <br />1010) <br />1019-Present Regional Manager, CTS Western Region — Responsible for performing <br />inspections of new and existing tanks, preparation of reports with findings, <br />making recommendations for repair procedures and client liaison for inspection, <br />retrofit and repair projects in the Western US, Additionally, responsible for <br />assisting in the development and execution of repair projects including plan and <br />specification review and development, estimating, monitoring costs and quality <br />control. <br />2013-201 ti Regional Estlinator —Responsible for managing project bids, quantity takeoffs, <br />cost estimation and managing the scope of work delineation with subcontractors <br />and prime contractors. provides support for project development through <br />construction feasibility planning, plan and specification reviews, site visits and <br />site layouts, <br />2012-2013 ProAct Enghmor = provide office and field assistance to project manage€s and <br />suporintendants, Responsible for preparing concrete mix designs and ether <br />project submittals, Making sit@ progress and quality control inspections, <br />prepa€ing shoring drawings and site layouts, checking material purchase orders <br />and imuing requost for quotations and subcontractor pu€chase ord@ts. <br />2009 2012 CO®PalrRtivr Edtlratlnn Stadant % Responsible for assisting in the management <br />of both the Mimating and @xecution of new tank and repair projects in both the <br />offtc@ and the field, <br />iderth@a§t@rn llniv@r§lty, ®e§ton, MA <br />II.S. in civil Engin@@ring <br />Averciditationt; <br />R@gi§t@r@d a§ a PrAmienal Engin@@r in the §tat@ of Califoeiia: <br />N <br />
The URL can be used to link to this page
Your browser does not support the video tag.