Laserfiche WebLink
4.2.2 Cart Overage <br />Customers may periodically generate more Solid Waste than will fit in the Refuse <br />Cart(s). Customers may contact Contractor to have extra waste Collected as a Bulky <br />Item pickup under Section 4.2.10. <br />Items left adjacent to Carts on regularly scheduled Collection days that have not been <br />scheduled as a Bulky Item pickup, shall be counted as a Bulky Item pickup as described <br />in Section 4.2.10. Contractor to Collect items and leave a notice on Customer's Refuse <br />Cart notifying the Customer of the proper procedures to schedule a Bulky Item pickup. <br />4.2.3 Residential Curbside Service Unit Recyclable Materials Collection <br />[NOTE: MATERIALS TO BE UPDATED BASED ON SUCCESSFUL PROPOSER'S <br />PROPOSAL] <br />Contractor shall provide all Residential Curbside Service Unit Customers receiving Cart <br />Refuse Collection with a 96- gallon Cart for Collection of Recyclable Materials. <br />Customers needing smaller Containers may request 64-gallon or 35-gallon Recycling <br />Carts. Additional Recycling Carts may be requested for a monthly fee per Cart in <br />accordance with the approved rate schedule. <br />Recyclable Material Collection from Cart Customers within the City shall be a <br />minimum of once each week, on the same day as Refuse Collection, and from the same <br />set -out location as Refuse Containers. Contractor is responsible for moving all <br />Recycling Carts as necessary for Collection, and then returning them to their original <br />location. At a minimum, Recyclable Material Collected from Cart Customers shall <br />include, but not be limited to: glass, tin, aluminum, PET, HDPE, narrow neck plastics, <br />newspaper, mixed paper (including junk mail, phone books, and magazines), <br />cardboard, and any additional materials that can be recovered and Recycled. <br />Contractor and the City may meet and confer from time to time to re-evaluate this <br />Recyclable Material list and to consider any amendments to it, based upon new or <br />enhanced recycling technologies. Contractor shall ensure that all public education and <br />outreach is updated to reflect materials that may be placed in Recyclable Materials <br />Containers as they change during the term of this Agreement. Residential Recyclable <br />Materials Collection shall be on the same day of the week as Refuse Collection service. <br />March 9, 2020 34 City of Santa Ana - DRAFT <br />60A-123 <br />