Laserfiche WebLink
EXHIBIT 4 <br />COST ANALYSIS <br />PROJECT 176876; CROSSWALK UPGRADES PHASE II <br />HSIPL-5063(186) <br />Construction Contract $285,295.00 <br />Contract Administration $40,000.00 <br />Inspection and Testing $20,000.00 <br />Contingencies $115,105.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />:7iT _mxl <br />$460,400.00 <br />20A-106 <br />