Laserfiche WebLink
[JH7J. NATIONAL National Corrosion <br />ri CORROSION www.notional-corrosion.com <br />Deliverables <br />Preliminary repair procedures and Specifications — National Corrosion will produce written procedures <br />and coating specifications as a draft to be reviewed by the City of Santa Ana. Comments and revisions <br />may be made at this time. <br />Final Design —This task will include preparation of standard drawings and specifications (90% and Final): <br />90% Design Submittal —Prepare drawings and technical specifications for the proposed repairs <br />and coating specifications approved by the City after the Preliminary Report was submitted and <br />reviewed. Plans shall be drawn to scale (lightened record drawing plans may be used as a <br />background) and suitable for competitive public works bidding. The designed CP systems will be <br />contained within the city property and/or public right-of-way. A project schedule, and <br />engineer's estimated construction cost may be a part of the submittal. The plans and <br />specifications will be provided for the city to review. After incorporation of city comments into <br />the documents, hardcopies will be submitted to the pertinent cities for review, comment, and <br />applicable permit applications. The city will pay the permit review fees directly. <br />Final Design Submittal — All revisions from 90% design review will be used to prepare the final <br />plans and specifications. This submittal shall include final construction plans, bid item schedule <br />including quantities, descriptions, specifications, and technical provisions for the project. An <br />engineer's estimate of probable construction costs will also be included. A complete set of <br />construction plans and specifications via digital copies in PDF format and 2018 version of <br />AutoCAD .dwg format (with pen settings file) will be provided. National Corrosion shall provide a <br />copy of all required permits along with construction requirements if necessary. <br />Construction Phase / Inspection <br />Submittal/Shop Drawing Review —Review Contractor submittals for completeness and <br />conformity with the contract documents. Review any deviations and/or substitutions submitted <br />by the contractor and make recommendations to the city. <br />Requests for Information (RFIs) — Review contractor's request for information and prepare <br />responses to the contractor. Prepare any revisions to contract documents necessary to resolve <br />conflicts. Assume 10 RFIs. <br />Inspection and Quality Control — Aid the city during repairs and procedures by providing on -site <br />as -needed inspection services. <br />