Laserfiche WebLink
6. Pre -medicate procedure patients. <br />7, Begin diagnostics on patients. <br />8. Begin treatment on outpatients. <br />9. Begin medicalprocedhu•es/surgeries <br />10, Recover surgery patients <br />11, Medical notes and instructions for continued medical care are completed by the end of the day. <br />b. Schedule: <br />Tuesdays: <br />Dr De La Torre is able to dedicate one 8-hour shift per week (excluding major holidays) to The Santa <br />Ana Zoo and its population of various species beginning ,January 1" 2020, Tuesday shifts will begin at 9am and <br />convene at 5pm. Tuesday shifts are guaranteed each week unless, on rare occasions, Dr De La Torre <br />experiences an emergency at The Critter Care Center, Inc. that requires her immediate attention and presence. <br />In the event that an emergency arises that prevents Dr. De La Torre's presence at The Santa Ana Zoo, The <br />Critter Care Center, Inc, will still be available between the hours of 9am and 7pm Monday through Friday and <br />8:30am — 3pm Saturdays for potential emergencies or medical treatments. <br />Mondays: <br />The Critter Care Center, Inc. and its staff are readily available during hospital hours to intake any <br />potential emergency patients or patients needing any form of treatment or diagnostics. The Critter Care Center, <br />Inc. is opened between the hours of 7:30am to 7pm Monday through Friday and 7:30am to 3pm on Saturdays. <br />In the event of a medical emergency after hours, Dr Audra De La Torre and one veterinary technician will be on <br />call to provide immediate care at The Santa Ana Zoo location or The Critter Care Center, Inc. location, which <br />ever is best suitable for providing proper treatment to the patient(s). <br />III. Fee Proposal <br />a. Base Bid <br />Agrees to perform the scope of work for an annual total of $70,000 or $207.56 per hour for 8 <br />hours per week. This weekly fee will cover the complete scope of work as described in the <br />proposed outline. Any on or off site emergencies may be performed at a rate of $252.38 per <br />hour. <br />IV. Subcontractors <br />The Critter Care Center, Inc, and Dr De La "Torre do not currently utilize the services of any <br />subcontractors or outside sources. In the event that a subcontractor is needed, Dr De La Torre or her <br />teelmician will consult with The Santa Ana Zoo in order to determine whether or not the contractor <br />will be an acceptable resource. <br />